Total (All Time)$22M
Latest FY$2M
Primary AgencyDepartment of Defense
MV7 INC has received $22M in total federal contract awards
across 6 fiscal year(s). ▼ 12.4% vs FY2024 Peak year was FY2023 ($9M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $2.4M | 3건 | Department of Defense | |
| FY2024 | $2.7M | 10건 | Department of Defense | |
| FY2023 | $8.7M | 10건 | Department of Defense | |
| FY2022 | $2.7M | 7건 | Department of Defense | |
| FY2021 | $2.0M | 6건 | Department of Defense | |
| FY2020 | $3.7M | 4건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2023-09-25 | Department of Defense | $4.2M | REPAIR PRIMARY DISTRIBUTION B LINE OVERHEAD |
| 2023-05-15 | Department of Defense | $2.0M | INSTALL LPS KSCC |
| 2025-09-09 | Department of Defense | $1.9M | REPAIR SWITCHGEAR CAPE SOUTH GENERATOR PLANT CAPE CANAVERAL SPACE FORCE STATION |
| 2020-06-23 | Department of Defense | $1.5M | 1.2 MW GENERATOR -TRANSPORT, INSTALLATIO |
| 2022-11-01 | Department of Labor | $1.4M | MIAMI JCC – PROJECT #3722, BUILDING B ROOF REPLACEMENT AT MIAMI JOB CORPS CENTER |
| 2020-07-31 | Department of Defense | $1.4M | X005 NSA ORLANDO – PAVEMENT RESURFACING – PARKING LOT E |
| 2021-08-12 | Department of Defense | $970,786 | ALL LABOR, AND MATERIALS TO REPLACE OPEN-WIRE POLE-MOUNT TYPE TRANSFORMERS, AND |
| 2022-09-13 | Department of Defense | $859,824 | NOTU B85201 MODIFY RESTROOM AND WALLS |
| 2022-09-07 | Department of Defense | $855,860 | NOTU – B51902 REPAIR FIRE ALARM SYSTEM AT CAPE CANAVERAL, FL |
| 2020-08-12 | Department of Defense | $749,593 | REPLACE OVERHEAD POWER LINE DISTRIBUTION LINE AT THE MSA 2 WITH AN UNDERGROUND P |
| 2021-03-10 | Department of Defense | $496,149 | NOTU MACA AG CRANE REPAIRS |
| 2023-06-07 | Department of Defense | $428,747 | NOTU FENDER REPLACEMENT AT TRIDENT WHARF NORTH |
| 2024-09-17 | Department of Defense | $425,391 | 22258254 NAVAL ORDNANCE TEST UNIT (NOTU) BUILDING 1117 REPLACE ROOF, BUILDING 11 |
| 2024-09-30 | Department of Defense | $411,473 | X001 ORL MISCELLANEOUS CONSTRUCTION PROJECT |
| 2024-07-10 | Department of Defense | $411,360 | REPAIR CANOPY POLES B998: PROVIDE LABOR, MATERIALS, AND SUPERVISION. INCLUDES SH |
| 2023-09-07 | Department of Defense | $395,978 | ORL MISCELLANEOUS REPAIRS AT NSA ORLANDO |
| 2024-04-30 | Department of Defense | $322,323 | INDEFINITE-DELIVERY INDEFINITE-QUANTITY (IDIQ) SINGLE-AWARD TASK ORDER CONTRACT |
| 2022-08-30 | Department of Defense | $314,815 | NSAORL ENTRANCE CANOPY AND SECURITY BOLLARDS |
| 2025-09-22 | Department of Defense | $289,238 | EXTEND PERIMETER FENCE LINE FROM RESEARCH GATE PEDESTRIAN APT APPROXIMATELY 575 |
| 2023-10-25 | Department of Defense | $275,419 | CABLING AND WIRING CONSTRUCTION IN BUILDING 534 |