NORTH WIND SYSTEMS LLC Federal Contracts — Government Award History
Total (All Time)$20M
Latest FY$348,408
Primary AgencyDepartment of Defense
NORTH WIND SYSTEMS LLC has received $20M in total federal contract awards
across 8 fiscal year(s). ▼ 7.6% vs FY2025 Peak year was FY2019 ($10M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2026 | $348,408 | 3건 | Department of Defense | |
| FY2025 | $376,954 | 3건 | Department of Defense | |
| FY2024 | $433,351 | 6건 | Department of Defense | |
| FY2023 | $4.0M | 6건 | Department of Defense | |
| FY2022 | $379,131 | 4건 | Department of Defense | |
| FY2021 | $3.7M | 9건 | Department of Defense | |
| FY2020 | $393,907 | 3건 | National Aeronautics and Space Administration | |
| FY2019 | $10.2M | 4건 | National Aeronautics and Space Administration |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2018-10-01 | National Aeronautics and Space Administration | $9.0M | FORCE MEASUREMENT SUPPORT SERVICES |
| 2018-07-12 | Department of Defense | $3.0M | EXPERIMENTAL INVESTIGATION OF HIGH SPEED COMPRESSION |
| 2022-12-12 | Department of Defense | $2.9M | DESIGN, FABRICATION, DELIVERY, AND COMMISSION OF A HEATED-GAS, BLOWDOWN-TYPE HYP |
| 2021-06-10 | Department of Defense | $1.5M | VARIABLE GEOMETRY INLET STUDY |
| 2021-06-23 | Department of Defense | $949,558 | HIFIRE FLIGHT CONTROLS (HF2-C) FLIGHT SYSTEM DEVELOPMENT AND TEST |
| 2022-10-07 | Department of Defense | $875,000 | HI-CAP BALANCES |
| 2020-10-01 | National Aeronautics and Space Administration | $558,960 | DESIGN AND FABRICATION OF THE CROSSFLOW ATTENUATED NATURAL LAMINAR FLOW(CATNLF) |
| 2019-07-17 | Department of Defense | $553,000 | HI-CAPACITY FORCE TYPE BALANCE AND DUMMY BALANCE |
| 2018-12-04 | Department of Defense | $540,963 | DESIGN, FABRICATION, ASSEMBLY AND CALIBRTION OF A HIGH TEMPERATURE MASS FLOW PLU |
| 2026-02-12 | Department of Defense | $318,373 | MASS ELEMENT, CENTER MASS, AND END MASS |
| 2022-09-13 | Department of Defense | $253,960 | FASTENER, BSS/FWD ASSEMBLY |
| 2020-04-27 | National Aeronautics and Space Administration | $233,985 | DESIGN, ANALYSIS, AND FABRICATION OF NEW HARDWARE AND MODIFYING EXISTING SWASHPL |
| 2021-09-30 | Department of Defense | $199,561 | IAH MAF FASTENERS |
| 2021-01-08 | National Aeronautics and Space Administration | $180,772 | ROTOR STAND, LANGLEY ROTOR TEST STAND (LRTS) WHICH IS AN UPGRADE TO THE GENERAL |
| 2025-09-29 | Department of Defense | $169,118 | BPA #21 NAB LOAD TEST RING. |
| 2020-03-31 | National Aeronautics and Space Administration | $147,183 | FABRICATION AND DESIGN OF BOLD STEP TEST WIND TUNNEL MODEL. |
| 2021-09-16 | National Aeronautics and Space Administration | $146,267 | OUTBOARD WING MODEL |
| 2025-06-05 | Department of Defense | $125,436 | ASTERN GEARBOX |
| 2024-01-10 | Department of Defense | $113,970 | CLB ROTOR HUB GUARD |
| 2019-08-27 | National Aeronautics and Space Administration | $102,830 | DESIGN AND FABRICATION REQUIREMENTS FOR A ROTARY-WING TEST STAND FOR THE NASA IC |