TETRA TECH INC Federal Contracts — Government Award History
Total (All Time)$14M
Latest FY$2M
Primary AgencyDepartment of Defense
TETRA TECH INC has received $14M in total federal contract awards
across 6 fiscal year(s). ▼ 11.9% vs FY2024 Peak year was FY2023 ($3M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $1.6M | 3건 | Department of Defense | |
| FY2024 | $1.8M | 4건 | Department of Defense | |
| FY2023 | $3.3M | 4건 | Department of Defense | |
| FY2021 | $2.2M | 4건 | Department of Defense | |
| FY2020 | $2.4M | 3건 | Department of Defense | |
| FY2019 | $2.7M | 6건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2023-09-15 | Department of Defense | $1.6M | TASK 2E- 65% DESIGN, BCOES, DDR, & PLANS |
| 2021-05-28 | Department of Defense | $1.3M | COLUMBIA RIVER TREATY 2024 PROGRAM HEC-WAT AND HEC-RESSIM SUPPORT |
| 2024-05-17 | Department of Defense | $1.1M | DEXTER FISH FACILITY DDR P&S |
| 2016-09-26 | Department of Agriculture | $1.1M | IGF::CL::IGF FLORENCE FRS REHABILITATION PROJECT A&E SERVICES, CONTRACT NO. AG= |
| 2025-02-20 | Department of Defense | $1.1M | DTA019 JARVIS CREEK FLOOD CONTROL PROJECT |
| 2020-09-10 | Department of Defense | $1.1M | FT WAINWRIGHT LEIS |
| 2019-09-30 | Department of Defense | $1.1M | HHD GATE/HOIST REPLACEMENT DESIGN |
| 2019-09-30 | Department of Defense | $923,689 | FY2019 ARCHITECT-ENGINEERING SERVICES FOR MUD MOUNTAIN DAM, CASCADE CREEK WATER |
| 2019-10-08 | Department of Defense | $915,005 | ENGINEERING DURING CONSTRUCTION (EDC) IN SUPPORT OF THE USACE SEATTLE DISTRICT A |
| 2021-06-16 | Department of Defense | $878,693 | EAR063 SERVICES TO PROVIDE DB RFP FOR LONG TERM PIER REPAIR, EARECKSON AIR STATI |
| 2023-09-20 | Department of Defense | $806,451 | HEC-WAT FLOOD RISH ANALYSIS |
| 2018-01-12 | Department of Agriculture | $515,410 | IGF::OT::IGF ACEP-WRE EASEMENT BOUNDARY SURVEYS, EASEMENTS IN ILLINOIS |
| 2023-03-08 | Department of Defense | $453,057 | DESIGN SERVICES TO PREPARE FEASIBILITY |
| 2023-09-30 | Department of Defense | $452,238 | WATER CONTROL MANUAL UPDATE |
| 2024-12-02 | Department of Defense | $441,091 | LWSC SL ECS AE SERVICES |
| 2024-04-11 | Department of Defense | $385,133 | GEOTECHNICAL INVESTIGATION, ST. GEORGE HARBOR IMPROVEMENT, ST. GEORGE, ALASKA |
| 2020-04-22 | Department of Defense | $375,799 | DESIGN SERVICES TO PREPARE DESIGN&SOLICITATION DOCUMENTS KET005 FLOATING BREAKW |
| 2024-08-21 | Department of Defense | $320,638 | IDIQ 23D1000 TASK ORDER FOR ARCHITECT-ENGINEER DESIGN SERVICES FOR MUD MOUNTAIN |
| 2019-03-26 | Department of Defense | $292,283 | WATER CONTROL MANUAL REVISIONS FOR GRAND COULEE DAM |
| 2025-10-07 | Department of Defense | $261,296 | PORT OF NOME MODIFICATION LETTER OF AUTHORIZATION |