NS & ASSOCIATES, LLC Federal Contracts — Government Award History

Total (All Time)$14M
Latest FY$7M
Primary AgencyGeneral Services Administration

NS & ASSOCIATES, LLC has received $14M in total federal contract awards
across 3 fiscal year(s). ▲ 39.3% vs FY2024 Peak year was FY2025 ($7M).
Primary awarding agency: General Services Administration.

Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).

Awards by Fiscal Year

Year Spending Total Contracts Top Agency
FY2025

$6.8M 3건 General Services Administration
FY2024

$4.9M 4건 General Services Administration
FY2023

$2.0M 3건 General Services Administration

Notable Contracts

Date Agency Amount Description
2025-06-04 General Services Administration $3.0M REPAIRS IN SWITCHGEAR ROOM LOCATED AT THE GSA CENTRAL OFFICE BUILDING 1800 F STR
2025-07-24 General Services Administration $2.9M RETROFIT BOILER 3
2024-07-11 General Services Administration $1.9M AHU REPLACEMENT & LOADING DOCK AIR CURTAINS LOCATED AT THE WASHINGTON NATIONAL R
2024-06-25 General Services Administration $1.8M USGS DEAERATOR REPLACEMENT LOCATED AT THE USGS POWELL BUILDING
2019-09-03 General Services Administration $1.7M BOILER NO. 4 TUBE REPAIRS AT THE HEATING OPERATIONS AND TRANSMISSIONS DIVISION
2023-06-29 General Services Administration $1.0M REPAIR OF COOLING TOWERS 5 THROUGH 8, 325 13TH STREET SW WASHINGTON, DC 20407
2025-07-03 General Services Administration $903,644 GENERAL STEAM REPAIRS AT HOTD
2023-06-27 General Services Administration $834,733 RETROFIT BOILER #6 HOTD BUILDING, 325 13TH ST. S.W. WASHINGTON D.C
2022-03-23 General Services Administration $770,098 STEAM PLANT REPAIRS HOTD BUILDING S.W. WASHINGTON D.C
2024-06-26 General Services Administration $586,878 GENERAL STEAM PLANT REPAIRS FY24 AT HOTD
2024-06-05 General Services Administration $585,638 NARA VISUAL SURVEILLANCE SYSTEM REPLACEMENT WASHINGTON NATIONAL RECORDS CENTER
2021-08-06 General Services Administration $548,540 GENERAL STEAM PLANT REPAIRS TO THE CENTRAL HEATING PLANT SYSTEM
2026-09-15 General Services Administration $263,176 THE PURPOSE OF THIS PROJECT IS TO DO HOTWELL STRUCTURAL INSPECTION AND MINIMUM R
2023-05-30 General Services Administration $198,307 INSTALLATION OF MAKE-UP WATER AND BLOWDOWN
2022-05-11 General Services Administration $106,864 TECHNICAL STUDY FOR THE NOX REDUCTION STRATEGY AT CHRP