LORD, AECK & SARGENT, INC. Federal Contracts — Government Award History
Total (All Time)$11M
Latest FY$4M
Primary AgencyDepartment of the Interior
LORD, AECK & SARGENT, INC. has received $11M in total federal contract awards
across 3 fiscal year(s). ▲ 58.0% vs FY2020 Peak year was FY2021 ($4M).
Primary awarding agency: Department of the Interior.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2021 | $4.3M | 21건 | Department of the Interior | |
| FY2020 | $2.7M | 19건 | Department of the Interior | |
| FY2019 | $4.3M | 6건 | Department of the Interior |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2019-09-25 | Department of the Interior | $2.8M | EVER 259050 TAMIAMI TRAIL MODIFICATIONS PHASE II |
| 2020-10-01 | Department of the Interior | $1.1M | VICK 310916 – PARK WIDE ROAD STUDY |
| 2019-09-20 | Department of the Interior | $493,308 | SHEN-A/E SERVICES RECONSTRUCT STONE WALL |
| 2019-09-25 | Department of the Interior | $467,843 | VIIS 244620, CULTURAL RESOURCE DOCUMENTATION, CONDITION ASSESSMENTS, AND TREATME |
| 2021-07-26 | Department of the Interior | $435,465 | ARCHITECT-ENGINEER SERVICES FOR BATTERY CULLUM-SEVIER STABILIZATION REPAIRS AND |
| 2021-05-25 | Department of the Interior | $428,988 | GRSM 149285 – WATER/WASTEWATER SYSTEM REHAB MODIFIED DD/CD |
| 2020-09-16 | Department of the Interior | $411,921 | WASO 310314 |
| 2021-07-22 | Department of the Interior | $373,953 | ARCHITECT AND ENGINEERING SERVICES TO CONDUCT CONDITION ASSESSMENTS OF WASTEWATE |
| 2020-07-07 | Department of the Interior | $277,495 | DRTO 241934 – TITLE III SERVICES AWARD |
| 2020-08-17 | Department of the Interior | $269,040 | PROVIDE SCHEMATIC DESIGN, DESIGN DEVELOPMENT, AND CONSTRUCTION DOCUMENT DEVELOPM |
| 2019-09-05 | Department of the Interior | $267,576 | DRTO 244370 COUNTERSCARP PD-VA-BENTHIC |
| 2021-03-29 | Department of the Interior | $244,920 | GRSM 149285 – SUGARLANDS WATER & WASTEWATER SYSTEMS REHAB SUPPLEMENTAL SERVICES |
| 2021-07-16 | Department of the Interior | $238,784 | TUIN 231534, CARVER MUSEUM AE SERVICES FOR DESIGN DEVELOPMENT (DD) AND CONSTRUCT |
| 2020-09-24 | Department of the Interior | $234,074 | TUIN 231534 – REHABILITATE CARVER MUSEUM |
| 2018-09-11 | Department of the Interior | $215,042 | A/E DESIGN SERVICES FOR A SEPTIC SYSTEM AT THE FORT RALEIGH NATIONAL HISTORIC SI |
| 2021-08-16 | Department of the Interior | $214,751 | A/E SVS DISCOVERY NATURE TRAIL BOARDWALK ~11,550 SF – HURRICANE SALLY – DESIGN A |
| 2020-07-01 | Department of the Interior | $205,026 | DRTO 244372/244373, PD/SDS FOR PERFORM DREDGING OF FORT JEFFERSON MOAT AND FING |
| 2020-03-23 | Department of the Interior | $181,706 | MALU 257817 DESIGN SERVICES PREDESIGN AND SCHEMATIC DESIGN FOR MARTIN LUTHER KIN |
| 2021-08-16 | Department of the Interior | $174,050 | A/E SVS DAVIS BAYOU TRAILS BOARDWALK DESIGN – HURRICANE ZETA PMIS 313366B | PEPC |
| 2021-07-26 | Department of the Interior | $173,905 | CORRECT CARL ELECTRICAL ISSUES |