FFA ARCHITECTURE AND INTERIORS, INC. Federal Contracts — Government Award History

Total (All Time)$10M
Latest FY$1M
Primary AgencyDepartment of the Interior

FFA ARCHITECTURE AND INTERIORS, INC. has received $10M in total federal contract awards
across 6 fiscal year(s). ▼ 60.0% vs FY2023 Peak year was FY2023 ($3M).
Primary awarding agency: Department of the Interior.

Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).

Awards by Fiscal Year

Year Spending Total Contracts Top Agency
FY2024

$1.1M 7건 Department of the Interior
FY2023

$2.7M 13건 Department of the Interior
FY2022

$1.3M 13건 Department of the Interior
FY2021

$1.6M 12건 Department of the Interior
FY2020

$1.6M 10건 Department of the Interior
FY2019

$1.3M 5건 Department of the Interior

Notable Contracts

Date Agency Amount Description
2019-08-09 Department of the Interior $958,590 TITLE III TECHNICAL CONSTRUCTION ENGINEERING SERVICES FOR SCORPION PIER REPLACEM
2023-04-28 Department of the Interior $932,774 OR-LOOKINGGLASS FH-AE-INTAKE REPLACEMENT
2021-09-02 Department of the Interior $624,204 GOGA 212511D, REPAIR WEST WING OF FORT MASON FOR SEISMIC STRENGTHENING, DD-CD
2023-03-09 Department of the Interior $580,024 WA-RIDGEFIELD NWR-AE FOR REPAIR OR REHAB OF INTAKE
2020-06-11 Department of the Interior $365,708 GOGA 212511D SIESMIC STRENGTHENING FORT MASON
2023-09-21 Department of the Interior $323,121 TITLE I CONDITION ASSESSMENT SERVICES, PERFORM CONDITION ASSESSMENTS ON FORT CRO
2020-07-16 Department of the Interior $309,518 TITLE I CONDITION ASSESSMENTS OF GGHD, CG LODGE, AND LP MARKET – PMIS 295791&295
2024-08-01 Department of the Interior $269,374 TITLE I PRELIMINARY DESIGN AND TITLE II DESIGN AND FINAL CONSTRUCTION DOCUMENTS
2020-10-01 Department of the Interior $265,485 PREPARE HSR FOR BROOKS CAMP
2024-09-25 Department of Agriculture $239,031 ZIGZAG HISTORIC WAREHOUSE DESIGN
2023-11-22 Department of the Interior $222,203 SEKI 252472 ASH MOUNTAIN DORMS SD, CD, DD.
2020-06-26 Department of the Interior $211,344 TITLE II DESIGN DEVELOPMENT REPORT, CONTRACT DOCUMENTS TO CORRECT FUEL TANK AND
2023-08-03 Department of the Interior $203,888 CONSTRUCTION PHASE SERVICES, REPAIR WEST WING OF FM201 FOR SEISMIC STRENGTHENING
2023-08-23 Department of the Interior $202,557 UPDATE HISTORIC STRUCTURES REPORT FOR TOWER HOUSE HISTORIC DISTRICT STRUCTURES,
2022-09-23 Department of the Interior $194,656 AE TITLE I SCOPING, SURVEY AND TESTING SERVICES FOR REHABILITATE HEADQUARTERS AD
2019-12-18 Department of the Interior $178,041 TITLE II DESIGN SERVICES REHAB CALLVILLE BAY (CB) LOOP A CAMPGROUND (CG) – 22616
2019-09-16 Department of the Interior $170,411 GLBA 248873&AKRO 210466C: THE WORK IN GLBA INCLUDES PREPARING MAINTENANCE GUIDEL
2024-07-08 Department of the Interior $170,410 TITLE I PRELIMINARY DESIGN AND TITLE II DESIGN AND FINAL CONSTRUCTION DOCUMENTS
2022-09-07 Department of the Interior $150,907 PREPARE FOVA CULTURAL LANDSCAPE REPORT AND UPDATE FOUR CULTURAL LANDSCAPE INVENT
2022-09-22 Department of the Interior $142,355 AE TITLE I SCOPING SERVICES FOR PREPARE CULTURAL LANDSCAPE REPORT FOR KEYS RANCH