PETERSON ENGINEERING INC Federal Contracts — Government Award History
Total (All Time)$9M
Latest FY$176,407
Primary AgencyDepartment of Defense
PETERSON ENGINEERING INC has received $9M in total federal contract awards
across 7 fiscal year(s). ▼ 94.0% vs FY2025 Peak year was FY2025 ($3M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2026 | $176,407 | 3건 | Department of Defense | |
| FY2025 | $2.9M | 17건 | Department of Defense | |
| FY2024 | $2.1M | 16건 | Department of Defense | |
| FY2023 | $1.3M | 10건 | Department of Defense | |
| FY2022 | $920,224 | 12건 | Department of Defense | |
| FY2021 | $1.0M | 10건 | Department of Defense | |
| FY2020 | $172,788 | 3건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2024-10-24 | Department of Defense | $816,719 | BLDG 374 GUIDED WEAPONS EVALUATION FACILITY (GWEF) UPGRADE HVAC – CORRECT FIRE P |
| 2018-10-17 | Department of Defense | $345,961 | FTFA 12-1069 RENOVATION OF BUILDING 600 DESIGN |
| 2023-08-29 | Department of Defense | $342,404 | INTERIOR RENOVATION REDESIGN, BUILDING 90131 |
| 2024-07-15 | Department of Defense | $341,745 | THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION, EQUIPMENT |
| 2025-03-27 | Department of Defense | $337,333 | PROVIDE NEW REFRIGERANT TRANSFER AND STORAGE SYSTEM. |
| 2018-09-12 | Department of Defense | $238,900 | FTFA 17-1082 UPGRD HVAC/CORRECT FPD’S BLDG 374 |
| 2022-04-19 | Department of Defense | $235,132 | DESIGN REPAIR FIRE SUPPRESSION HANGARS 90032, 900700 AND 90816 |
| 2024-01-02 | Department of Defense | $230,902 | FY24 F18JC 374421 96CEN FM9 (FTFA22CB17) DSN REPAIR BLDG 134 |
| 2024-08-26 | Department of Defense | $229,902 | PZIOCB / DESIGN SERVICES TO: REPAIR HVAC, CONTROLS, INSTRUMENTATION, AND FIRE PR |
| 2025-08-11 | Department of Defense | $229,703 | DESIGN – UPDATE POWER/DATA/FIBER GRID SITE C-64 TEST AREAS |
| 2025-05-14 | Department of Defense | $224,965 | DESIGN HVAC SYSTEM FOR BLDG. 421 |
| 2023-11-16 | Department of Defense | $224,961 | PZIOCB – FY24 F18JC 374421 96CEN FM9 (FTFA171133) REPAIR CARPET, HVAC, FIRE PROT |
| 2025-02-06 | Department of Defense | $224,155 | DESIGN – REPLACE MULTI HVAC SYSTEM WITH CENTRAL HVAC BUILDING 272 |
| 2023-04-24 | Department of Defense | $204,432 | PZIOCB / FY23 F18JC E74449 96 CEG FM 9 (FTFA 171070) DSN-REPAIR UPDATE FOAM FIRE |
| 2023-10-31 | Department of Defense | $202,711 | DESIGN FIRE TRAINING FACILITY REPAIR |
| 2021-09-29 | Department of Defense | $200,268 | PZIOCB / DESIGN – REPLACE SPRINKLER HEADS AND HVAC SYSTEM, BLDG. 78, FTFA 18CR09 |
| 2022-04-19 | Department of Defense | $196,957 | DESIGN REPAIR FIRE SUPPRESSION HANGARS 90810, 91262 AND 91266 |
| 2023-04-28 | Department of Defense | $188,114 | PZIOCB / FY23 F18JC E74449 96 CEG FM 9 (FTFA 171080) DSN-REPAIR UPDATE FOAM FIRE |
| 2024-10-15 | Department of Defense | $187,439 | DESIGN ADD ENTIRE FACILITY ELECTRICAL LOAD TO GENERATOR, 7 SPECIAL FORCES GROUP |
| 2023-06-20 | Department of Defense | $184,117 | PZIOCB / FY23 F18JC E74449 96 CEG FM 9 (FTFA 22PV54CR) CHARRETTE: REPAIR FIRE PR |