DAERUK CONSTRUCTION CO., LTD. Federal Contracts — Government Award History
Total (All Time)$6M
Latest FY$1M
Primary AgencyDepartment of Defense
DAERUK CONSTRUCTION CO., LTD. has received $6M in total federal contract awards
across 5 fiscal year(s). ▲ 1.2% vs FY2024 Peak year was FY2023 ($2M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $1.2M | 13건 | Department of Defense | |
| FY2024 | $1.2M | 16건 | Department of Defense | |
| FY2023 | $1.9M | 21건 | Department of Defense | |
| FY2022 | $1.2M | 17건 | Department of Defense | |
| FY2021 | $555,501 | 9건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2021-12-22 | Department of Defense | $226,294 | REPAIR ROOFS, RAINGUTTER AND DOWNSPOUTS AT CNFK HEADQUARTER BUSAN AND CFA CHINHA |
| 2025-03-04 | Department of Defense | $205,066 | REPLACE GENERATORS FOR BUILDINGS 412-A, 737 AND 742 CFA CHINHAE |
| 2023-03-17 | Department of Defense | $195,774 | INSTALL BACK-UP GENERATOR FOR BUILDING 711 AT CFA CHINHAE |
| 2022-12-14 | Department of Defense | $194,288 | UPGRADE HVAC SYSTEM INCLUDING DEHUMIDIFICATION SYSTEM ATBARRACKS BUILDINGS, CFA |
| 2022-12-17 | Department of Defense | $181,160 | UPGRADE PLUMBING SYSTEMS, SPRINKLER PIPING AND WATER PIPING SYSTEM AT VARIOUS BU |
| 2023-07-03 | Department of Defense | $179,000 | REPLACE BOILER AT BUILDING 502, MEDICAL CLINIC CHINHAE |
| 2023-05-04 | Department of Defense | $177,110 | RENOVATE VARIOUS BUILDINGS AT CFA CHINHAE |
| 2023-12-28 | Department of Defense | $174,911 | REPAIR WTP WATER TANKS AND AIR STRIPPING TOWER AT CFA CHINHAE |
| 2022-12-12 | Department of Defense | $171,096 | REPLACE OUTDATED TRANSFORMERS AND 22.9KV, AT BLDG #214, AT CFA CHINHAE, KOREA |
| 2024-03-28 | Department of Defense | $156,304 | INTERIOR RENOVATION OF VARIOUS BUILDINGS AT CFA CHINHAE |
| 2022-12-09 | Department of Defense | $150,529 | REPAIR RETAINING WALLS AND SIDEWALK AT CFA CHINHAE |
| 2024-05-09 | Department of Defense | $148,301 | REPAIR SEWER SYSTEM THROUGHOUT BASE AT CFA CHINHAE |
| 2025-06-16 | Department of Defense | $146,856 | THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TRANSPORTATION AND |
| 2022-06-24 | Department of Defense | $145,265 | REPLACE HVAC SYSTEMS FOR BUILDING 722 AT CFA CHINHAE |
| 2025-03-12 | Department of Defense | $139,780 | EXPAND BASE BACK UP GENERATOR FUEL TANK TO 40,000 LITERS CAPACITY AT CFA CHINHAE |
| 2022-03-23 | Department of Defense | $139,512 | RENOVATE INTERIOR FINISHES AND DEHUMIDIFY SYSTEMS FOR THREE (3) BUILDINGS, AT CF |
| 2021-01-15 | Department of Defense | $136,490 | REPAIR EXTERIOR DOORS, ROLL-UP DOORS AND WALLS AT VARIOUS BUILDINGS, CFA CHINHAE |
| 2023-09-13 | Department of Defense | $133,428 | REPAIR RETAINING WALL DAMAGES AT SOCKOR, CFA CHINHAE |
| 2022-07-29 | Department of Defense | $133,425 | REPAIR FIRE PROTECTION SYSTEMS FOR VARIOUS BUILDINGS AT CFA CHINHAE |
| 2022-06-27 | Department of Defense | $125,784 | ENCLOSE THE DECK AT BACK OF CNFK HQ BUILDING, BUSAN, KOREA |