H D CW JOINT VENTURE, THE Federal Contracts — Government Award History
Total (All Time)$6M
Latest FY$4M
Primary AgencyDepartment of Defense
H D CW JOINT VENTURE, THE has received $6M in total federal contract awards
across 3 fiscal year(s). ▲ 233.6% vs FY2024 Peak year was FY2025 ($4M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $4.0M | 3건 | Department of Defense | |
| FY2024 | $1.2M | 3건 | Department of Defense | |
| FY2023 | $812,989 | 3건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2025-12-19 | Department of Defense | $2.0M | HIGH HAZARD DAMS- FORT BRAGG, NC |
| 2025-05-01 | Department of Defense | $1.6M | DESIGN OF NEUSE RIVER STABILIZATION |
| 2025-09-17 | Department of Defense | $1.5M | CONCEPTUAL DESIGNS AND COST ESTIMATES |
| 2025-09-29 | Department of Defense | $919,376 | BASE – 35% DESIGN |
| 2024-09-30 | Department of Defense | $872,445 | CLIN 0001 (BASE) – AE40000-LB SRM FA-240 |
| 2023-09-25 | Department of Defense | $493,901 | ARCHITECT-ENGINEER SERVICES FOR MCFAYDEN AND LAKE TREE DAMS REPAIR FORT LIBERTY, |
| 2021-09-22 | Department of Defense | $282,958 | GEORGIA HURRICANE EVACUATION STUDY |
| 2024-09-20 | Department of Defense | $260,673 | A-E GENERAL DESIGN SERVICES |
| 2023-09-25 | Department of Defense | $226,084 | ARCHITECT-ENGINEER (A-E) SERVICES FOR BLDG. 6102 STORMWATER SINKHOLE REPAIR, PN: |
| 2022-09-22 | Department of Defense | $131,371 | FLOOD PLAIN MANAGEMENT SERVICES STUDY PIN POINT – SAVANNAH GA |
| 2023-07-12 | Department of Defense | $93,004 | ARCHITECT-ENGINEERING (A-E) SERVICES FOR LARGE SINKHOLE REPAIR IN BLDG. 775, FOR |
| 2024-05-13 | Department of Defense | $78,632 | TASK ORDER TO PROVIDE ARCHITECT-ENGINEER SERVICES FOR VALUE ENGINEERING FOR LAKE |