SGS KG LLC Federal Contracts — Government Award History
Total (All Time)$1M
Latest FY$483,701
Primary AgencyGeneral Services Administration
SGS KG LLC has received $1M in total federal contract awards
across 3 fiscal year(s). ▲ 28.2% vs FY2023 Peak year was FY2024 ($483,701).
Primary awarding agency: General Services Administration.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2024 | $483,701 | 8건 | General Services Administration | |
| FY2023 | $377,443 | 12건 | General Services Administration | |
| FY2022 | $228,346 | 5건 | General Services Administration |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2024-01-10 | General Services Administration | $230,373 | PROVIDE EMERGENCY REMEDIATION OF DAMAGED/IMPACTED MATERIALS CAUSED BY A WATER LE |
| 2022-09-14 | General Services Administration | $112,727 | REPLACE 1B CHILLER COMPRESSOR AND CONTROLS AT NSFB 210 WALNUT ST. DES MOINES, IA |
| 2023-06-07 | General Services Administration | $109,640 | PROVIDE REMEDIATION OF DAMAGED/IMPACTED MATERIALS CAUSED BY A WATER LEAK ON THE |
| 2024-06-03 | General Services Administration | $91,791 | GENERAL SERVICES ADMINISTRATION, WATER FLUSHING AND TESTING AT THE US DES MOINES |
| 2024-01-19 | General Services Administration | $49,489 | INSTALL A FLOW METER AND ACTUATOR VALVE CONTROLLED BY THE EXISTING BAS, AT NEAL |
| 2022-06-06 | General Services Administration | $49,324 | INSTALL RELIEF VALVES, CHILLER CONTROLS, SOFTWARE, INTEGRATION TO EXISTING SYSTE |
| 2023-07-27 | General Services Administration | $45,749 | INSTALL REPLACEMENT CURB WATER VALVE AT THE NEAL SMITH FEDERAL BUILDING, 210 WAL |
| 2021-06-15 | General Services Administration | $45,577 | LABELING OF ELECTRICAL PANELS AT NEAL SMITH FEDERAL BUILDING, 210 WALNUT STREET, |
| 2022-11-10 | General Services Administration | $42,525 | PROVIDE AN EPOXY COATING ON CHILLERS 2A & 2B AND NEW CHILLER ANODES FOR CHILLERS |
| 2023-03-20 | General Services Administration | $41,579 | INSTALL A FLOW METER AND ACTUATOR VALVE CONTROLLED BY THE EXISTING BAS AT THE NE |
| 2021-11-12 | General Services Administration | $30,810 | EPOXY CHILLER 1 & 2 ENDS NEAL SMITH FEDERAL BUILDING, 210 WALNUT STREET, DES MOI |
| 2023-07-13 | General Services Administration | $26,356 | REPLACE EJECTOR PUMP AND EJECTOR PUMP MOTOR AT THE NEAL SMITH FEDERAL BUILDING, |
| 2024-03-06 | General Services Administration | $25,651 | REPLACE, BRIEF DESCRIPTION OF WORK TO PROVIDE A MAKEUP WATER SENSOR ON THE BOILE |
| 2023-12-18 | General Services Administration | $24,090 | LABEL EACH BREAKER IN 21 PANELS IN THE BASEMENT AND 1ST FLOOR AT THE NEAL SMITH |
| 2024-06-13 | General Services Administration | $23,264 | TROUBLESHOOTING FOR REPAIR AND REPLACEMENT OF DAMAGED ELECTRICAL WIRING CAUSED B |
| 2022-06-29 | General Services Administration | $22,484 | LABEL BREAKERS IN THE ELECTRICAL PANELS ON 6TH & 7TH FLOORS. NEAL SMITH FEDERAL |
| 2023-06-16 | General Services Administration | $21,608 | INSTALL FLOW SENSOR 2B AND INTEGRATION TO EXISTING SYSTEM AT THE NEAL SMITH FEDE |
| 2024-08-08 | General Services Administration | $20,680 | PROVIDE EMERGENCY CLEAN UP AND REPLACEMENT OF VANDALIZED WINDOWS AT THE NEW DES |
| 2022-11-16 | General Services Administration | $19,889 | PROVIDE & INSTALL REPLACEMENT CONDENSER PUMP #1 AND INTEGRATION TO EXISTING SYST |
| 2024-03-08 | General Services Administration | $18,362 | INSTALL CAR TOP HANDRAILS ON ELEVATORS 1, 2, 4, 5, AND 6 AT THE NEAL SMITH FEDER |