KORTE CONSTRUCTION COMPANY Federal Contracts — Government Award History
Total (All Time)$860M
Latest FY$272M
Primary AgencyDepartment of Defense
KORTE CONSTRUCTION COMPANY has received $860M in total federal contract awards
across 5 fiscal year(s). ▲ 107.5% vs FY2021 Peak year was FY2019 ($281M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $271.5M | 5건 | Department of Defense | |
| FY2021 | $130.8M | 3건 | Department of Defense | |
| FY2020 | $94.3M | 3건 | Department of Defense | |
| FY2019 | $280.6M | 5건 | Department of Defense | |
| FY2018 | $82.3M | 3건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2024-10-10 | Department of Defense | $144.7M | DISASTER RESILIENCY PROGRAM (DRP) PHASE 1 |
| 2023-09-26 | Department of Defense | $121.3M | GBSD CMF |
| 2025-10-10 | Department of Defense | $106.1M | DISASTER RESILIENCY PROGRAM (DRP) PHASE 2 CREECH AFB NEVADA |
| 2019-09-27 | Department of Defense | $73.2M | DESIGN AND CONSTRUCTION OF THE KC-46A FUEL MAINTENANCE HANGAR ON THE KC-46A CAMP |
| 2021-05-13 | Department of Defense | $67.2M | AIRCRAFT MAINTENANCE HANGAR |
| 2019-08-28 | Department of Defense | $65.3M | DESIGN AND CONSTRUCTION OF THE KC-46A DEPOT MAINTENANCE HANGAR ON THE KC-46A CAM |
| 2024-10-10 | Department of Defense | $61.6M | CONSTRUCTION OF DRP AIRCRAFT MAINTENANCE FACILITY, GRAND FORKS BLDG. 649 |
| 2019-09-27 | Department of Defense | $59.6M | P-741 NAVY GATEWAY INN&SUITES |
| 2019-09-26 | Department of Defense | $50.0M | DESIGN AND CONSTRUCTION OF MQ-9 GCS OPERATIONS FAC AND OPERATIONS/COMMAND FACILI |
| 2016-07-29 | Department of Defense | $49.7M | IGF::OT::IGF PROPULSION MAINTENANCE WING (PMXG) PLATING SHOP RENOVATION AT TINKE |
| 2022-05-19 | Department of Defense | $40.4M | PRIMARY FACILITY(53WG OPS-TEST FACILITY) |
| 2015-09-28 | Department of Defense | $37.5M | IGF::OT::IGF BRANCH HEALTH CLINIC MODERNIZATION, BUILDING 1028, NAVAL STATION KI |
| 2020-09-29 | Department of Defense | $37.2M | 365 ISR GROUP CONSOLIDATED FACILITY |
| 2021-09-28 | Department of Defense | $36.4M | DESIGN & CONSTRUCT FLIGHT TEST ENGINEERING LABORATORY COMPLEX AT EDWARDDS AFB, C |
| 2025-01-23 | Department of Defense | $35.0M | FORT HUNTER LIGGETT NETWORK ENTERPRISE CENTER: THIS PROJECT PROVIDES FOR THE DE |
| 2020-08-06 | Department of Defense | $34.8M | DESIGN AND CONSTRUCTION OF A TWO STORY 72,140 SQUARE FOOT JOINT SIMULATION ENVIR |
| 2024-04-25 | Department of Defense | $32.8M | X001 DB CONSTRUCTION MACC TO TP22010M REPAIR STUDENT BEQ 1666 29 |
| 2019-04-25 | Department of Defense | $32.4M | DESIGN BUILD F35 INTEGRATED TRAINING CENTER ACADEMICS BUILDING, EGLIN AFB, FL |
| 2018-07-13 | Department of Defense | $30.7M | IGF::OT::IGF FY 18 VIRTUAL WARFARE OPERATIONS FACILITY, NELLIS AFB, NV POP 720 C |
| 2018-07-31 | Department of Defense | $28.6M | IGF::OT::IGF P403 RECRUIT RECONDITIONING CENTER BARRACK RENOVATION |