THE MASON & HANGER GROUP INC. Federal Contracts — Government Award History
Total (All Time)$72M
Latest FY$6M
Primary AgencyDepartment of Defense
THE MASON & HANGER GROUP INC. has received $72M in total federal contract awards
across 9 fiscal year(s). ▲ 85.9% vs FY2025 Peak year was FY2023 ($20M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2026 | $6.1M | 3건 | Department of Defense | |
| FY2025 | $3.3M | 5건 | Department of Defense | |
| FY2024 | $11.4M | 17건 | Department of Defense | |
| FY2023 | $19.6M | 23건 | Department of Defense | |
| FY2022 | $6.3M | 17건 | Department of Defense | |
| FY2021 | $6.1M | 12건 | Department of Defense | |
| FY2020 | $1.6M | 4건 | Department of Defense | |
| FY2019 | $12.1M | 15건 | Department of Defense | |
| FY2018 | $5.0M | 4건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2016-02-17 | Department of Defense | $5.0M | .IGF::OT::IGF A/E DESIGN SERVICES P163 AGILE CHEMICAL FACILITY (ACF) PHASE 3 |
| 2026-02-20 | Department of Defense | $3.4M | F35A PRECISION GUIDED MUNITIONS, MOODY AFB, GA |
| 2018-09-19 | Department of Defense | $3.3M | PN 87437 35% DESIGN SUBMITTAL |
| 2023-06-16 | Department of Defense | $3.2M | BASE SCOPE 35% |
| 2023-04-04 | Department of Defense | $3.0M | A/E DESIGN SERVICES |
| 2022-03-11 | Department of Defense | $2.6M | PROVIDE A/E SERVICES FOR DESIGN BID BUILD CONSTRUCTION OF A 200-MEMBER ARMY RESE |
| 2019-09-20 | Department of Defense | $2.4M | ARMY RESERVE CENTER ASHEVILLE, NC |
| 2021-04-23 | Department of Defense | $2.1M | PROVIDE AE SERVICES NECESSARY FOR TO DEVELOP THE DESIGN-BID-BUILD RFP FOR FORT B |
| 2023-09-22 | Department of Defense | $2.0M | A/E SERVICES FOR DESIGN-BID-BUILD FOR CONSTRUCTION OF A COLLOCATED VEHICLE MAINT |
| 2019-09-24 | Department of Defense | $2.0M | PROVIDE AE SERVICES FOR THE RENOVATIONS OF BUILDING 5406, 5502, AND 5503 LOCATED |
| 2024-08-14 | Department of Defense | $1.7M | LRL AE DESIGN MATOC – VIRTUALIZED ELECTROMAGNETIC WARFARE & MISSION ENGINEERING |
| 2024-08-14 | Department of Defense | $1.7M | LRL AE DESIGN MATOC UNMANNED FUSION WARFARE LABORATORY TASK ORDER |
| 2025-10-01 | Department of Defense | $1.6M | PROVIDE ARCHITECT-ENGINEER (A-E) DESIGN SERVICES FOR THE JACKSONVILLE ARMY RESER |
| 2018-09-25 | Department of Defense | $1.3M | CAVEN POINT, NJ ARC FFR AE/TO – BASE PROPOSAL |
| 2023-07-14 | Department of Defense | $1.3M | BASE SCOPE 100% DESIGN -TOOELE AND HAWTHORNE |
| 2019-07-17 | Department of Defense | $1.2M | 35% DESIGN – JOINT OPERATIONS CENTER – FORT POLK, LA |
| 2024-09-30 | Department of Defense | $1.2M | BASE SCOPE |
| 2023-04-27 | Department of Defense | $1.1M | NEW TASK ORDER AWARD FOR 6.0 MW MICROGRID AT JOINT BASE LEWIS-MCCHORD, WA |
| 2019-09-10 | Department of Defense | $1.1M | ARCHITECT-ENGINEER SERVICES FOR THE CRANE BLDG. 2521 METAL FINISHING ROOM PROJEC |
| 2019-10-11 | Department of Defense | $1.1M | DESIGN OF GUN RANGE FOR FT DEVENS |