JACOBS ENGINEERING GROUP INC. Federal Contracts — Government Award History

Total (All Time)$69M
Latest FY$1M
Primary AgencyDepartment of Transportation

JACOBS ENGINEERING GROUP INC. has received $69M in total federal contract awards
across 9 fiscal year(s). ▼ 51.4% vs FY2025 Peak year was FY2023 ($20M).
Primary awarding agency: Department of Transportation.

Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).

Awards by Fiscal Year

Year Spending Total Contracts Top Agency
FY2026

$1.0M 6건 Department of Transportation
FY2025

$2.1M 7건 Department of Transportation
FY2024

$11.1M 11건 Department of Transportation
FY2023

$20.2M 22건 Department of Defense
FY2022

$10.1M 25건 Department of Transportation
FY2021

$13.4M 29건 Department of Transportation
FY2020

$2.3M 15건 Department of Transportation
FY2019

$7.3M 9건 Department of Transportation
FY2018

$1.4M 4건 Department of Transportation

Notable Contracts

Date Agency Amount Description
2023-09-29 Department of Defense $7.2M SENTINEL GROUND BASED STRATEGIC DETERRENT FY26 INTEGRATED COMMAND CENTER
2024-05-30 Department of Transportation $7.1M MT ERFO NP YELL 2022-1(2), YELLOWSTONE NP MAMMOTH TO GARDINER ROAD INTERMEDIATE
2021-09-14 Department of Transportation $7.0M WY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD ENVIRONMENTAL ASSESSMENT AND 30% DESI
2019-03-22 Department of Transportation $4.2M WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE SCOPING TRIP AND SUBSEQUENT REPORT.
2023-04-20 Department of Transportation $4.0M AK NPS DENA 10(49), POLYCHROME AREA IMPROVEMENTS SUPPORT THE PROJECT DURING ADVE
2022-01-18 Department of Transportation $4.0M AK NPS DENA 10(49), POLYCHROME AREA IMPROVEMENTS PROVIDE DESIGN-BUILD PROCUREMEN
2024-05-13 Department of Transportation $2.7M WY NPS YELL 12(4), NORTHEAST ENTRANCE ROAD, PHASE 1 INTERMEDIATE THROUGH FINAL D
2023-09-30 Department of Defense $2.5M AFSC OIB DEPOT OPTIMIZATION 2023-2025, AIR FORCE SUSTAINMENT CENTER (AFSC)
2019-06-19 Department of Transportation $2.2M WY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD PRELIMINARY DESIGN PHASES.
2022-09-15 Department of Transportation $1.8M WY ERFO NP YELL 2022-1(1), MAMMOTH TO GARDINER PERMANENT REPAIRS PRELIMINARY GEO
2022-09-15 Department of Defense $1.4M BONNEVILLE NAVLOCK BRIDGE A&E DESIGN
2025-04-08 Department of Transportation $1.3M ID BOR SRAO 0017(1), SPORTSMAN’S PARK TRANSPORTATION IMPROVEMENTS
2021-08-27 Department of Transportation $1.3M WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE INTERMEDIATE THROUGH FINAL DESIGN PH
2023-06-28 Department of Transportation $1.2M MT NPS YELL 12(5), NORTHEAST ENTRANCE ROAD, SEED PROJECT INTERMEDIATE THROUGH FI
2021-02-22 Department of Transportation $1.2M AK NPS DENA 10(49), POLYCHROME AREA IMPROVEMENTS GEOTECHNICAL DESIGNS
2023-05-17 Department of Transportation $937,805 AK FLAP DOT 198(4), MCCARTHY ROAD PLANNING AND ENVIRONMENTAL LINKAGES STUDY PLAN
2026-01-16 Department of Transportation $805,874 A/E CONSTRUCTION SUPPORT FOR AK NPS DENA 10(49), POLYCHROME AREA IMPROVEMENTS
2021-09-02 Department of Transportation $784,027 NV FLAP 500(1) RED ROCK TRAIL
2023-03-01 Department of Transportation $772,615 WY NPS YELL 10(25), CANYON TO FISHING BRIDGE JUNCTION NEPA ENVIRONMENTAL SERVICE
2023-03-07 Department of Transportation $697,231 WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE PROVIDES SERVICES DURING THE SOLICIT