LIBERTY JV Federal Contracts — Government Award History
Total (All Time)$47M
Latest FY$7M
Primary AgencyDepartment of Defense
LIBERTY JV has received $47M in total federal contract awards
across 6 fiscal year(s). ▼ 12.5% vs FY2024 Peak year was FY2022 ($15M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $7.0M | 23건 | Department of Defense | |
| FY2024 | $8.0M | 26건 | Department of Defense | |
| FY2023 | $6.8M | 19건 | Department of Defense | |
| FY2022 | $14.8M | 26건 | Department of Defense | |
| FY2021 | $10.0M | 19건 | Department of Defense | |
| FY2020 | $941,149 | 3건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2022-05-24 | Department of Defense | $4.1M | SITE INSPECTIONS OF PER- AND POLYFLUOROALKYL SUBSTANCES (PFAS) SI |
| 2022-07-08 | Department of Defense | $2.6M | VARIOUS COMPLIANCE PROGRAM SUPPORT FOR INSTALLATION OPERATION |
| 2021-07-27 | Department of Defense | $1.9M | SITE YF3 DATA GAPS EVALUATION AND WORK PLAN, FORMER NAVAL STATION TREASURE ISLAN |
| 2021-08-10 | Department of Defense | $1.2M | X008 REMEDIAL INVESTIGATIONS AND FEASIBILITY STUDIES AT UXO 011 ( |
| 2022-09-13 | Department of Defense | $1.1M | MULTIPLE SITES: (1) FS AT IR SITE 41 IA-100 (2) PP, ROD AT UXO 1 |
| 2023-09-30 | Department of Defense | $1.1M | CLIN 0001 |
| 2025-09-07 | Department of Defense | $1.1M | PRE-REMEDIAL DESIGN CHARACTERIZATION AND REVISED FEASIBILITY STUD |
| 2025-06-18 | Department of Defense | $1.1M | THIS TASK ORDER (TO) IS TO CONDUCT REMEDY OPTIMIZATION TO AID CLEANUP OF OPERABL |
| 2022-05-06 | Department of Defense | $1.0M | LOW-THREAT UST CLOSURE EVALUATION, GROUNDWATER SAMPLING |
| 2020-10-15 | Department of Defense | $953,014 | THIS REQUIREMENT IS FOR THE A-E TO TAKE THE DRAWING PACKAGE EXECUTED FOR SIMILAR |
| 2022-09-02 | Department of Defense | $934,770 | X021 FY 2022-2023 STORMWATER AND POTABLE WATER QUALITY COMPLIANCE |
| 2024-08-28 | Department of Defense | $912,132 | X030 REMEDIAL INVESTIGATION AT MINS OB/OD RANGE UXO SITE 14 |
| 2021-08-19 | Department of Defense | $910,107 | PRELIMINARY ASSESSMENT (PA) AND SITE INSPECTION (SI) |
| 2023-08-31 | Department of Defense | $879,792 | FY 2023-2024 STORM WATER, POTABLE WATER, WASTEWATER, AND GROUNDWATER COMPLIANCE |
| 2023-07-25 | Department of Defense | $822,461 | TITLE II ARCHITECT AND ENGINEERING QUALITY ASSURANCE FOR VARIOUS PROJECTS LOCATE |
| 2023-06-28 | Department of Defense | $769,524 | 23 BANGOR (200) PERCHED ZONE BIOSTIMULATION PH. 6 |
| 2024-07-25 | Department of Defense | $762,365 | CONTRACT NO. N44255-20-D-5006, CTO N6247324F4853: RI OF PFAS AT VARIOUS SITES, F |
| 2021-03-31 | Department of Defense | $755,884 | MILCON VS FSRM STUDY FOR DORMITORIES B1469, B1472, B1475, B1479, B3312, B3314, B |
| 2025-09-30 | Department of Defense | $702,110 | THIS REQUIREMENT IS SO THAT THE ARCHITECT-ENGINEER CAN PROVIDE DESIGN DRAWINGS, |
| 2024-08-12 | Department of Defense | $610,676 | THIS REQUIREMENT IS FOR ARCHITECT-ENGINEER SERVICES FOR JOINT BASE SAN ANTONIO, |