Total (All Time)$9M
Latest FY$6M
Primary AgencyDepartment of the Interior
ADVANCED SOLUTIONS GROUP, LLC has received $9M in total federal contract awards
across 2 fiscal year(s). ▲ 98.6% vs FY2022 Peak year was FY2024 ($6M).
Primary awarding agency: Department of the Interior.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2024 | $5.8M | 4건 | Department of the Interior | |
| FY2022 | $2.9M | 3건 | Department of the Interior |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2024-09-16 | Department of the Interior | $4.5M | CANY NEEDLES PV SYSTEM |
| 2026-05-20 | Department of Agriculture | $2.0M | 0401 LUCERNE CAMPGROUND CONSTRUCTION PHASE 5 |
| 2022-09-22 | Department of the Interior | $1.3M | ZION-REPLACE ROOF ON HQ/MUSEUM |
| 2024-12-20 | Department of the Interior | $979,410 | ZION-EMPO RELOCATE EMERALD POOLS BRIDGE |
| 2024-09-05 | Department of the Interior | $946,933 | ARCH-RECONSTRUCT RETAINING WALL |
| 2021-10-01 | Department of the Interior | $888,347 | ZION-WATER SYSTEM DEFICIENCY CORRECTIONS |
| 2022-03-30 | Department of the Interior | $765,335 | ZION PMIS 240155 & 240083 – LODGE AND TEMPLE SHUTTLE STOP MODIFICATIONS AT ZION |
| 2020-09-18 | Department of the Interior | $750,747 | REHAB HQ/HOUSING WASTEWATER AND TWO LIFT STATIONS AT CAPITAL REEF NATIONAL PARK |
| 2021-03-31 | Department of the Interior | $725,322 | HUNGRY HORSE DAM DRAINAGE SUMP PUMP REPLACEMENTS |
| 2021-05-07 | Department of the Interior | $450,954 | HUNGRY HORSE DOMESTIC WATER WELL PLAN — FLATHEAD COUNTY, MONTANA |
| 2024-06-11 | Department of the Interior | $265,568 | ROMO 240851 REPLACE BIERSTADT VT |
| 2020-09-18 | Department of the Interior | $196,371 | CANY – UPGRADE ELECTRICAL DISTRIBUTION |
| 2019-07-08 | Department of the Interior | $170,326 | REPLACE ELECTRICAL SYSTEM AND INSTALL AUTOMATIC FIRE SUPPRESSION SYSTEM IN THE R |
| 2025-09-04 | Department of the Interior | $112,048 | OLD FAITHFUL VISITOR CENTER SOUTH DOOR REPLACEMENT WITH THE OPTION TO PURCHASE E |
| 2024-09-08 | Department of the Interior | $99,549 | ROMO-GLACIER BASIN NETWORK TOWER |
| 2026-05-20 | Department of the Interior | $54,893 | GRTE: REMOVE SPRAY FOAM FROM LUPINE CABINS FOR GRAND TETON NATIONAL PARK |