AHTNA-CDM SMITH JV Federal Contracts — Government Award History
Total (All Time)$90M
Latest FY$38M
Primary AgencyDepartment of Defense
AHTNA-CDM SMITH JV has received $90M in total federal contract awards
across 5 fiscal year(s). ▲ 86.5% vs FY2023 Peak year was FY2024 ($38M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2024 | $37.9M | 3건 | Department of Defense | |
| FY2023 | $20.3M | 3건 | Department of Defense | |
| FY2022 | $5.2M | 5건 | Department of Defense | |
| FY2021 | $2.1M | 3건 | Department of Defense | |
| FY2020 | $24.6M | 4건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2024-04-08 | Department of Defense | $25.3M | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLAC |
| 2020-04-07 | Department of Defense | $22.9M | REPAIR 400 AIRCRAFT PARKING RAMP PHASE 2&REPAIR TAXIWAY NOVEMBER ADJACENT TO 400 |
| 2023-09-28 | Department of Defense | $11.6M | DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSH |
| 2023-10-06 | Department of Defense | $7.3M | DESIGN AND CONSTRUCTION SERVICES FOR CARGO DEPLOYMENT RAMP REPAIR, EBBING ANGB, |
| 2023-09-28 | Department of Defense | $5.5M | REPAIR FUEL TANKS AT MAXWELL AFB, ALABAMA |
| 2024-01-30 | Department of Defense | $5.4M | DEMOLISH 1.25-MILE PIPELINE BETWEEN DFSP NEWINGTON AND PEASE ANGB |
| 2023-07-18 | Department of Defense | $3.2M | CONSTRUCTION: B1068 REPLACE FIRE SUPPRESSION AND ALARM SYSTEMS |
| 2022-09-12 | Department of Defense | $2.0M | DESIGN AND CONSTRUCTION OF A CRAH (COMPUTER ROOM AIR HANDLER) BASED HVAC SYSTEM. |
| 2022-08-31 | Department of Defense | $1.3M | THE REMOVAL OF A CHAIN LINKED FENCE AROUND THE MAIN ELECTRICAL SWITCH YARD, AND |
| 2021-11-04 | Department of Defense | $1.2M | SOUTH APRON CONCRETE EXPANSION PROJECT |
| 2020-09-24 | Department of Defense | $799,274 | INSTALL JET BLAST DEFLECTORS AT TWO LOCATIONS, DESIGN AND CONSTRUCT ENGINE RUN A |
| 2021-09-30 | Department of Defense | $771,364 | REC TASK ORDER TO REPLACE THE FIRE SUPPRESSION SYSTEM AT B1073 AT BEALE AFB |
| 2020-07-22 | Department of Defense | $736,868 | WHEELER GENERATOR REPLACEMENT AT B310 |
| 2021-09-16 | Department of Defense | $648,723 | RUBBER REMOVAL AND PAINT |
| 2020-10-06 | Department of Defense | $648,723 | REMOVE, REPLACE, DESIGN, AND CONSTRUCT AIRFIELD SECURITY GATES ALONG THE FLIGHT |
| 2022-02-08 | Department of Defense | $474,480 | DESIGN AND REPLACE BOILERS FOR DORMS. |
| 2022-09-13 | Department of Defense | $293,404 | AIRFIELD PAINTING AND RUBBER REMOVAL |
| 2020-09-22 | Department of Defense | $215,049 | HVAC REPLACEMENT AT PAVE PAWS |