APPLEDORE MARINE – CH2M JV Federal Contracts — Government Award History

Total (All Time)$5M
Latest FY$3M
Primary AgencyDepartment of Defense

APPLEDORE MARINE – CH2M JV has received $5M in total federal contract awards
across 2 fiscal year(s). ▲ 90.4% vs FY2021 Peak year was FY2022 ($3M).
Primary awarding agency: Department of Defense.

Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).

Awards by Fiscal Year

Year Spending Total Contracts Top Agency
FY2022

$3.3M 6건 Department of Defense
FY2021

$1.7M 7건 Department of Defense

Notable Contracts

Date Agency Amount Description
2025-09-23 Department of Defense $4.4M THE PURPOSE OF THIS PROJECT IS TO PROVIDE DESIGN AND ENGINEERING SERVICES TO SUP
2018-07-27 Department of Defense $3.3M IGF::OT::IGF DRY DOCK 2 PORTAL CRANE RAIL REPAIRS
2025-09-24 Department of Defense $3.3M THE PURPOSE OF THIS PROJECT IS TO PROVIDE ENGINEERING AND DESIGN SERVICES TO SUP
2020-03-11 Department of Defense $2.4M X005 RM19-0760 BERTH 6 REPAIRS AND IMPROVEMENTSSAES FOR AE DESIGN
2022-07-05 Department of Defense $1.1M SWIMMING RIVER CULVERTS REPAIR A&E STUDY
2020-07-23 Department of Defense $1.0M AUXILIARY SEAWATER PUMP REPAIRS DD3
2023-02-28 Department of Defense $916,682 TCE/MSC FIRE SCHOOL DEMOLITION
2022-04-21 Department of Defense $633,798 ARCHITECT/ENGINEER (A/E) POST AWARD CONSTRUCTION SERVICES (PCAS) FOR COMMISSIONI
2020-12-30 Department of Defense $553,510 STILLWATER BASIN UPGRADES FOR LDUUV AND XLUUV PROGRAM
2022-09-26 Department of Defense $438,301 X006 1387709 — DESIGN BRIDGE 2 REFRESH
2022-07-07 Department of Defense $416,394 PIER-2 REPAIR BERTH 23 FENDER PILES A/E DESIGN
2021-08-17 Department of Defense $415,425 R28- REPLACE BOILERS 1,2,3 A&E STUDY
2022-08-11 Department of Defense $409,361 J3 – ESI PROJECT STABILIZE WASHOUT ALONG ROAD TO MAGAZINE J3.
2022-07-05 Department of Defense $295,069 NWS EARLE TRESTLE 4 REPAIRS/ PIER 4 HEAVY WEATHER ANALYSIS
2021-09-14 Department of Defense $271,629 B30 PICATTINY RENOVATION
2023-03-07 Department of Defense $215,060 MWR MARINA REPAIRS (DESIGN)
2021-08-18 Department of Defense $177,223 NWS EARLE RAIL STRUCTURAL SURVEY
2026-01-15 Department of Defense $159,401 P836 THIRD PARTY AE INDEPENDENT COST ESTIMATE THE PURPOSE OF THIS TASK ORDER I
2021-09-24 Department of Defense $147,035 C38 RENOVATE 2ND DECK FOR FBI
2021-02-09 Department of Defense $137,745 P1043 WATER TREATMENT PLANT AT HADNOT POINT, CAMP LEJEUNE NC