BARRY WILLIAMS ELECTRIC INC Federal Contracts — Government Award History
Total (All Time)$21M
Latest FY$3M
Primary AgencyDepartment of Transportation
BARRY WILLIAMS ELECTRIC INC has received $21M in total federal contract awards
across 7 fiscal year(s). ▼ 15.2% vs FY2025 Peak year was FY2023 ($7M).
Primary awarding agency: Department of Transportation.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2026 | $2.5M | 36건 | Department of Transportation | |
| FY2025 | $3.0M | 57건 | Department of Transportation | |
| FY2024 | $3.1M | 27건 | Department of Transportation | |
| FY2023 | $7.3M | 50건 | Department of Transportation | |
| FY2022 | $3.9M | 16건 | Department of Transportation | |
| FY2020 | $768,981 | 3건 | Department of Transportation | |
| FY2018 | $295,379 | 3건 | Department of Transportation |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2025-07-17 | Department of Transportation | $779,828 | IIJA FUNDS. SITE SPECIFIC INSTALLATION COST FOR EG AND FST REPLACEMENT, ERMS IN |
| 2020-09-17 | Department of Transportation | $535,536 | MULTIPLE LOCATIONS FOR UPS INSTALLATION |
| 2026-01-21 | Department of Transportation | $436,297 | REPLACE THE EXISTING ENGINE GENERATOR (EG) WITH A KOHLER 40KW PROPANE EG, INSTAL |
| 2022-05-10 | Department of Transportation | $409,560 | INSTALLATION FUNDING FOR THE EG, ERMS, AND FST REPLACEMENT PROJECT AT THE GXY AS |
| 2024-07-29 | Department of Transportation | $398,453 | 2024 OUTDOOR EG BASELINE SITE SURVEY, DESIGN AND INSTALL FUNDING FOR SAN ANTONIO |
| 2024-07-29 | Department of Transportation | $398,453 | 2024 OUTDOOR EG BASELINE SITE SURVEY, DESIGN AND INSTALL FUNDING FOR EL PASO, TX |
| 2023-09-12 | Department of Transportation | $353,587 | BIL FUNDING, FST SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTE |
| 2023-09-12 | Department of Transportation | $353,587 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTEM |
| 2023-09-12 | Department of Transportation | $353,587 | BIL FUNDING FOR FST SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SY |
| 2023-09-12 | Department of Transportation | $353,587 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTEM |
| 2025-09-24 | Department of Transportation | $312,000 | TO FUND THE FUEL STORAGE TANK (FST) REPLACEMENT AT LCH ASR. |
| 2026-03-25 | Department of Transportation | $309,390 | IIJA FUNDS. EG INSTALL, FULL POWER SYSTEM STUDY AND ERMS FUNDING AT CHELSEA, OK |
| 2026-01-28 | Department of Transportation | $299,829 | IIJA FUNDED. NASHWAUK, MN (QJD) ARSR JCN:19004780 THIS UNILATERAL AWARD IS FOR T |
| 2026-05-26 | Department of Transportation | $292,069 | IIJA FUNDED THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UP |
| 2023-01-12 | Department of Transportation | $285,172 | BIL FUNDS: ISSUE BASELINE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF A |
| 2022-09-08 | Department of Transportation | $285,126 | BIL FUNDING FOR EG INSTALLATION AND LPGBS BILS FOR HOUSTON, TX (HUBA) ALS JCN:22 |
| 2022-09-12 | Department of Transportation | $285,126 | BIL FUNDING FOR SITE SURVEY, DESIGN, EG INSTALLATION AND LPGBS AT ALBUQUERQUE, N |
| 2022-09-08 | Department of Transportation | $285,126 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT AUSTIN, TX (VNK) ALS |
| 2022-09-12 | Department of Transportation | $285,126 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION FOR SAN ANTONIO, TX (AN |
| 2022-09-08 | Department of Transportation | $285,126 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT LONGVIEW, TX (GGGA) |