BARRY WILLIAMS ELECTRIC INC Federal Contracts — Government Award History

Total (All Time)$21M
Latest FY$3M
Primary AgencyDepartment of Transportation

BARRY WILLIAMS ELECTRIC INC has received $21M in total federal contract awards
across 7 fiscal year(s). ▼ 15.2% vs FY2025 Peak year was FY2023 ($7M).
Primary awarding agency: Department of Transportation.

Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).

Awards by Fiscal Year

Year Spending Total Contracts Top Agency
FY2026

$2.5M 36건 Department of Transportation
FY2025

$3.0M 57건 Department of Transportation
FY2024

$3.1M 27건 Department of Transportation
FY2023

$7.3M 50건 Department of Transportation
FY2022

$3.9M 16건 Department of Transportation
FY2020

$768,981 3건 Department of Transportation
FY2018

$295,379 3건 Department of Transportation

Notable Contracts

Date Agency Amount Description
2025-07-17 Department of Transportation $779,828 IIJA FUNDS. SITE SPECIFIC INSTALLATION COST FOR EG AND FST REPLACEMENT, ERMS IN
2020-09-17 Department of Transportation $535,536 MULTIPLE LOCATIONS FOR UPS INSTALLATION
2026-01-21 Department of Transportation $436,297 REPLACE THE EXISTING ENGINE GENERATOR (EG) WITH A KOHLER 40KW PROPANE EG, INSTAL
2022-05-10 Department of Transportation $409,560 INSTALLATION FUNDING FOR THE EG, ERMS, AND FST REPLACEMENT PROJECT AT THE GXY AS
2024-07-29 Department of Transportation $398,453 2024 OUTDOOR EG BASELINE SITE SURVEY, DESIGN AND INSTALL FUNDING FOR SAN ANTONIO
2024-07-29 Department of Transportation $398,453 2024 OUTDOOR EG BASELINE SITE SURVEY, DESIGN AND INSTALL FUNDING FOR EL PASO, TX
2023-09-12 Department of Transportation $353,587 BIL FUNDING, FST SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTE
2023-09-12 Department of Transportation $353,587 BIL FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTEM
2023-09-12 Department of Transportation $353,587 BIL FUNDING FOR FST SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SY
2023-09-12 Department of Transportation $353,587 BIL FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR EG PO LED POWER SYSTEM
2025-09-24 Department of Transportation $312,000 TO FUND THE FUEL STORAGE TANK (FST) REPLACEMENT AT LCH ASR.
2026-03-25 Department of Transportation $309,390 IIJA FUNDS. EG INSTALL, FULL POWER SYSTEM STUDY AND ERMS FUNDING AT CHELSEA, OK
2026-01-28 Department of Transportation $299,829 IIJA FUNDED. NASHWAUK, MN (QJD) ARSR JCN:19004780 THIS UNILATERAL AWARD IS FOR T
2026-05-26 Department of Transportation $292,069 IIJA FUNDED THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UP
2023-01-12 Department of Transportation $285,172 BIL FUNDS: ISSUE BASELINE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF A
2022-09-08 Department of Transportation $285,126 BIL FUNDING FOR EG INSTALLATION AND LPGBS BILS FOR HOUSTON, TX (HUBA) ALS JCN:22
2022-09-12 Department of Transportation $285,126 BIL FUNDING FOR SITE SURVEY, DESIGN, EG INSTALLATION AND LPGBS AT ALBUQUERQUE, N
2022-09-08 Department of Transportation $285,126 BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT AUSTIN, TX (VNK) ALS
2022-09-12 Department of Transportation $285,126 BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION FOR SAN ANTONIO, TX (AN
2022-09-08 Department of Transportation $285,126 BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT LONGVIEW, TX (GGGA)