BELL BOEING JOINT PROJECT OFFICE Federal Contracts — Government Award History
Total (All Time)$554M
Recent FY$554M
Top Agency
BELL BOEING JOINT PROJECT OFFICE has received $554M in total federal contract awards.
Primary awarding agency: .
Data source: USASpending.gov
Awards by Fiscal Year
| Year | Total | Contracts | Top Agency |
|---|---|---|---|
| FY2026 | $554.3M | 5 | — |
Recent Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2007-04-02 | $11041.0M | MV-22 AIRCRAFT – FY08 (LOT 12)* | |
| 2011-12-29 | $7337.5M | PROCUREMENT OF V-22 LOT 17 LONG LEAD-TIME ITEMS | |
| 2016-12-28 | $6597.2M | CMV-22 PRODUCTION LOT 22 LONG LEAD-TIME ITEMS | |
| 2019-01-01 | $924.2M | V-22 PBL PERIOD OF PERFORMANCE 1 (1 JANUARY 2019 – 31 DECEMBER 2019) | |
| 2004-02-23 | $822.4M | ||
| 2024-01-06 | $389.2M | V-22 PERFORMANCE BASED LOGISTICS CONTRACT POP 3 (01/06/2024 – 01/05/2025) | |
| 2025-01-06 | $358.0M | V-22 PBL POP 4 (6 JAN 2025 – 5 JAN 2026) | |
| 2020-12-31 | $344.5M | V-22 NACELLE IMPROVEMENTS STEP 2 | |
| 2026-01-06 | $330.9M | V-22 PBL POP 5 (6 JAN 2026 – 5 JAN 2027) | |
| 2023-01-06 | $329.5M | V-22 PBL PERIOD OF PERFORMANCE 2 (6 JAN 2023 TO 5 JAN 2024) | |
| 2022-01-06 | $313.8M | V-22 PBL (POP 1: 06 JAN 2022 – 05 JAN 2023) | |
| 2021-09-30 | $214.4M | NON-RECURRING ENGINEERING (NRE)FOR V-22 FLIGHT CONTROL SYSTEM. | |
| 2019-12-01 | $210.6M | PBL&E EFFORT FOR THE V-22 PROGRAM | |
| 2021-12-01 | $194.4M | PBL&E EFFORT FOR THE V-22 AIRCRAFT | |
| 2015-09-15 | $176.9M | NON-RECURRING ENGINEERING FOR V-22 FOR GOVERNMENT OF JAPAN. | |
| 2017-12-01 | $160.1M | INTEGRATED LOGISTIC SUPPORT | |
| 2023-01-01 | $155.3M | PBL&E EFFORT FOR THE V-22 AIRCRAFT | |
| 2007-12-21 | $151.7M | CV-22 BLOCK 20 NRE DEVELOPMENT AND TEST | |
| 2019-01-22 | $145.9M | PBL&E EFFORT FOR THE V-22 PROGRAM | |
| 2021-04-13 | $144.6M | V-22 BELL UNPLANNED OUTFITTING/ALLOWANCE BUY |