BRPH ARCHITECTS ENGINEERS INC Federal Contracts — Government Award History

Total (All Time)$9M
Latest FY$1M
Primary AgencyNational Aeronautics and Space Administration

BRPH ARCHITECTS ENGINEERS INC has received $9M in total federal contract awards
across 4 fiscal year(s). ▼ 29.1% vs FY2022 Peak year was FY2019 ($5M).
Primary awarding agency: National Aeronautics and Space Administration.

Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).

Awards by Fiscal Year

Notable Contracts

Date Agency Amount Description
2018-10-17 National Aeronautics and Space Administration $2.4M ENGINEERING SERVICES DURING THE CONSTRUCTION UPGRADE OF THE LIQUID HYDROGEN II (
2019-05-07 National Aeronautics and Space Administration $1.9M ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INSTALL VEHICLE ASSEMBLY
2020-06-10 National Aeronautics and Space Administration $1.8M ENGINEERING SERVICES DURING THE CONSTRUCTION TO CONVERTER COMPRESSOR FACILITY.
2022-07-25 National Aeronautics and Space Administration $770,133 DESIGN BOOSTER FABRICATION FACILITY (BFF) COMPLEX HEATING VENTILATION AIR CONDIT
2019-08-27 National Aeronautics and Space Administration $556,126 STUDY OF THE VEHICLE ASSEMBLY BUILDING (VAB) AND THE ROTATION, PROCESSING AND SU
2022-08-19 National Aeronautics and Space Administration $442,664 DESIGN OF INSTALL LIQUID NITROGEN (LN2) SYSTEM, LAUNCH COMPLEX 39B (LC-39B)
2025-06-02 National Aeronautics and Space Administration $438,106 SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO REPLACE T-10 TRANSFO
2024-04-01 National Aeronautics and Space Administration $412,064 ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INSTALL LIQUID NITROGEN (
2024-02-05 National Aeronautics and Space Administration $404,881 ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF BOOSTER FABRICATION FACIL
2021-09-15 National Aeronautics and Space Administration $330,518 STUDY OF THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX AT KSC FL PCN 99420
2021-08-02 National Aeronautics and Space Administration $310,314 STUDY UPGRADE HEATING VENTILATION AIR CONDITIONING (HVAC) AT THE BOOSTER FABRICA
2024-09-17 National Aeronautics and Space Administration $288,499 ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) UPGRADE HEATING VENTILATION AND
2021-09-08 National Aeronautics and Space Administration $260,645 DESIGN OF UPGRADE MISSILE GRADE AIR SYSTEM (MGA) AT BOOSTER FABRICATION FACILITY
2021-06-10 National Aeronautics and Space Administration $252,101 DESIGN OF REPLACE ROOFS AT BOOSTER FABRICATION FACILITY (BFF), PHASE 2 AT KENNED
2021-09-21 National Aeronautics and Space Administration $235,355 ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF UPGRADE VEHICLE ASSEMBLY BUIL
2022-09-08 National Aeronautics and Space Administration $213,835 BRIDGING DOCUMENT FOR BOOSTER FABRICATION FACILITY (BFF) CRANE REFURBISHMENT REV
2023-01-05 National Aeronautics and Space Administration $208,427 ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE ROOFS AT BOOSTER FABR
2022-08-26 National Aeronautics and Space Administration $148,580 ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF UPGRADE MISSILE GRADE AIR
2018-03-12 National Aeronautics and Space Administration $140,263 ENGINEERING SERVICES DURING CONSTRUCTION FOR REPLACING AIR HANDLING UNITS, SPACE
2022-08-05 National Aeronautics and Space Administration $117,523 CONDUCT PEER REVIEW OF UPGRADE MECHANICAL SYSTEMS AT COMPONENT REFURBISHMENT & C