GEOSTABILIZATION INTERNATIONAL, LLC Federal Contracts — Government Award History

Total (All Time)$6M
Latest FY$3M
Primary AgencyDepartment of Agriculture

GEOSTABILIZATION INTERNATIONAL, LLC has received $6M in total federal contract awards
across 3 fiscal year(s). ▲ 90.7% vs FY2024 Peak year was FY2026 ($3M).
Primary awarding agency: Department of Agriculture.

Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).

Awards by Fiscal Year

Year Spending Total Contracts Top Agency
FY2026

$3.5M 4건 Department of Agriculture
FY2024

$1.8M 3건 Department of Transportation
FY2020

$1.2M 4건 Department of Agriculture

Notable Contracts

Date Agency Amount Description
2025-10-13 Department of Agriculture $1.4M JACKS CREEK ROAD STABILIZATION PROJECT
2026-05-01 Department of Agriculture $1.2M THE OBJECTIVE OF THIS PROJECT IS TO IMPROVE THE STABILITY OF THE ROADWAY PLATFOR
2024-09-04 Department of Transportation $811,315 CANYON TO FISHING BRIDGE WY NPS YELL10(25) SLIDING MEADOWS ROADWAY EMBANKMENT S
2020-08-13 Department of Agriculture $747,693 ERF0 SLIDE REPAIR FSR44 MP 9.84.
2026-03-02 Department of Agriculture $634,492 THE OBJECTIVE OF THIS PROJECT IS TO IMPROVE THE STABILITY OF THE ROADWAY PLATFOR
2024-08-12 Department of Agriculture $633,200 GILMAN TUNNELS AND NFSR 376 SLOPE STABILIZATION SANTA FE NATIONAL FOREST
2022-09-28 Department of Agriculture $608,666 FOREST SERVICE ROAD 33 MP 15 ROCKFALL PROTECTION – AGAINST GSA CONTRACT NUMBER:
2025-04-21 Department of Transportation $508,035 WA ERFO NPS OLYM 2022-1 (2), OLYMPIC NPS ROAD 115 MP 1.8 REPAIR ROADWAY EMBANKM
2021-08-04 Department of Agriculture $472,747 LARCH MOUNTAIN TRAIL REPAIR
2023-06-07 Department of Agriculture $394,582 SERVICE, CLOW POINT CUTSLOPE STABILIZATION. EXISTING GSA SERVICE CONTRACT FOR RO
2024-07-30 Department of the Interior $365,681 STEENS MTN LOOP ROAD ROCKFALL
2025-12-11 Department of the Interior $263,669 WELLS CREEK RD SOIL NAILING ERFO OR-CBD
2022-09-01 Department of the Interior $223,895 BAYSIDE TRAIL SLIDE 2 REPAIR, CABRILLO NATIONAL MONUMENT, SAN DIEGO, CALIFORNIA
2020-08-26 Department of Agriculture $194,824 ERF0 SLIDE REPAIR FSR 4 MULKY GAP
2020-09-13 Department of Agriculture $177,845 D4 CATWALK EMERGENCY SCALING
2025-07-24 Department of the Interior $146,069 BURNT MTN TIE RD SOIL NAILING-COOS BAY, OR
2020-09-23 Department of Agriculture $62,661 WILLOW CREEK SLOPE STABILIZATION. PER ATTACHED TECHNICAL AND PRICING.