GHD-COWI JOINT VENTURE Federal Contracts — Government Award History
Total (All Time)$48M
Latest FY$8M
Primary AgencyDepartment of Defense
GHD-COWI JOINT VENTURE has received $48M in total federal contract awards
across 7 fiscal year(s). ▲ 154.4% vs FY2024 Peak year was FY2023 ($28M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $8.4M | 5건 | Department of Defense | |
| FY2024 | $3.3M | 4건 | Department of Defense | |
| FY2023 | $27.6M | 6건 | Department of Defense | |
| FY2022 | $1.6M | 3건 | Department of Defense | |
| FY2021 | $2.0M | 5건 | Department of Defense | |
| FY2020 | $3.5M | 4건 | Department of Defense | |
| FY2018 | $1.8M | 3건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2023-05-02 | Department of Defense | $19.3M | AE SERVICES FOR PDA WORK PALAU AND YAP. |
| 2022-10-27 | Department of Defense | $5.5M | X013 P508 – FLOATING DRY DOCK MOORING DESIGN CONTRACT |
| 2025-09-29 | Department of Defense | $4.4M | Q600, SOF COMBATANT CRAFT LAUNCH AND RECOVERY FACILITY, NBC, SAN CLEMENTE ISLAND |
| 2020-03-11 | Department of Defense | $1.6M | ST135-07 AE DB RFP CHOLLAS CREEK QUAY WALL REPLACEMENT NBSD |
| 2024-08-30 | Department of Defense | $1.6M | AE SERVICES FOR MULTI-MISSION DRY SUBMERSIBLE MMDS, CUSTOMER CONCEPT DOCUMENT AT |
| 2023-09-15 | Department of Defense | $1.5M | NBC ELECTRICAL STUDY ISO FORD CVN BERTHING CAPABILITYTHE INTENT O |
| 2025-09-24 | Department of Defense | $1.5M | WON 1868945 ENGINEERING ASSESSMENT ROMEO SIERRA WHARVES |
| 2018-09-17 | Department of Defense | $1.4M | IGF::OT::IGF X026 DESIGN AND ENGINEERING SERVICES FOR GRAVING DOCK MODIFICATION |
| 2025-05-02 | Department of Defense | $1.3M | A-E SERVICES IN SUPPORT OF PDI AUS |
| 2020-09-14 | Department of Defense | $1.1M | PERFORM SEISMIC EVALUATION STUDY FOR THREE PIERS |
| 2025-08-28 | Department of Defense | $1.1M | THE PURPOSE IS TO PROVIDE FOR THE PREPARATION OF A PIER OPTIMIZATION THAT INCLUD |
| 2024-01-26 | Department of Defense | $1.1M | AE DBB FOR WON 1799663 AAFB LANDFILL |
| 2021-06-15 | Department of Defense | $929,595 | X008 NBPL-302B A-E EFFORT TO PREPARE DBB CONSTRUCTION PACKAGE FOR |
| 2023-08-17 | Department of Defense | $679,695 | P600 SPECIAL OPERATIONS FORCES (SOF)COMBATANT CRAFT LAUNCH AND RECOVERY FACILITY |
| 2022-09-09 | Department of Defense | $634,559 | X012 PIER 14 FEASIBILITY STUDY – NBSD |
| 2022-03-03 | Department of Defense | $632,124 | AE IDIQ WATERFRONT ENGINEERING SERVICES |
| 2020-09-14 | Department of Defense | $562,169 | PROVIDE A-E SERVICES FOR AN ENGINEERING STUDY, REPAIR OPTIONS, AND DB RFP PACKAG |
| 2023-09-20 | Department of Defense | $524,671 | FUNCTIONAL ANALYSIS CONCEPT DESIGN STUDY |
| 2021-06-23 | Department of Defense | $523,264 | AE IDIQ WATERFRONT ENGINEERING SERVICES |
| 2019-09-30 | Department of Defense | $396,692 | AE IDIQ WATERFRONT ENGINEERING SERVICES NBPL BOOMS STUDY |