GREATER SOUTHWEST CONSTRUCTORS INC Federal Contracts — Government Award History
Total (All Time)$22M
Latest FY$9M
Primary AgencyDepartment of Transportation
GREATER SOUTHWEST CONSTRUCTORS INC has received $22M in total federal contract awards
across 3 fiscal year(s). ▼ 23.3% vs FY2024 Peak year was FY2024 ($11M).
Primary awarding agency: Department of Transportation.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $8.7M | 7건 | Department of Transportation | |
| FY2024 | $11.4M | 10건 | Department of Transportation | |
| FY2023 | $1.9M | 4건 | Department of Transportation |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2025-06-06 | Department of Transportation | $5.7M | CSA TOWERS REPLACEMENT; DEMOLITION OF OLD TOWERS AND REPLACED WITH NEW TOWERS |
| 2024-06-12 | Department of Transportation | $4.6M | REPLACE QMK RTR EQUIPMENT BUILDING AND TOWER MAUNA KAPU, OAHU, HI IN ACCORDANCE |
| 2024-08-22 | Department of Transportation | $2.5M | CONSTRUCT SELF-SUPPORTING ANTENNA TOWERS AT THE CHS-RCAG & CHSB-RTR TOWER REPLAC |
| 2024-11-26 | Department of Transportation | $2.4M | CONSTRUCT THE LIGHT LANE INFRASTRUCTURE FOR THE ESTABLISHMENT OF A DUAL MODE HIG |
| 2024-07-11 | Department of Transportation | $2.2M | REPLACEMENT OF MALSR STEEL TOWER ALONG WITH ITS ANCILLARY STRUCTURES AT FRANCISC |
| 2026-02-11 | Department of Transportation | $1.5M | REPLACE RUNWAY 34 MALS WITH MALSF AT ARLINGTON MUNICIPAL AIRPORT IN ARLINGTON, W |
| 2026-02-12 | Department of Transportation | $1.3M | CONSTRUCTION TO REPLACE THE RWY 17 (LBX) MALSR SYSTEM AT ANGLETON/LAKE JACKSON T |
| 2023-05-24 | Department of Transportation | $887,217 | ANTENNA TOWER DEMOLITION AND INSTALLATION IN CHEYENNE, WY. |
| 2024-07-24 | Department of Transportation | $690,688 | CONSTRUCT SELF-SUPPORTING ANTENNA TOWERS AT THE DELLE (QXQ), UTAH RCAG SITE, IN |
| 2023-08-25 | Department of Transportation | $494,195 | RCAG TOWER REPLACEMENT PROJECT AT THE SHR FACILITY IN SHERIDAN, WY N ACCORDANCE |
| 2024-09-23 | Department of Transportation | $467,370 | RENO, NV – INSTALLATION OF TWO (2) NEW OPERATIONAL RNO RTR TOWERS IN RENO, NV IN |
| 2024-04-16 | Department of Transportation | $461,006 | BOSTON, MA – REPLACEMENT OF THE EXISTING BOS LOC SHELTER WITH A NEW, PRE-CAST SH |
| 2023-08-09 | Department of Transportation | $399,891 | REPLACE THE EXISTING PWE VOR BUILDING WITH A DME SHELTER AND ANTENNA IN PAWNEE C |
| 2023-12-15 | Department of Transportation | $312,981 | DEMOLITION OF EXISTING TOWER AND INSTALLATION OF A NEW RCO TOWER AT THE FAA TAD |
| 2025-01-16 | Department of Transportation | $181,433 | FINLEY, ND – REPLACEMENT ELECTRICAL POWER DISTR EQUIP (QFI) ARSR IN FINLEY, ND I |
| 2025-02-18 | Department of Transportation | $145,144 | LAMPASAS, TX – REPLACEMENT ELECTRICAL PANEL AND HVAC (AGJ) VOR IN LAMPASAS, TX I |
| 2024-11-14 | Department of Transportation | $143,000 | SHELTER REPLACEMENT AT THE HOUSTON, TX (LKM) LOCALIZER IN ACCORDANCE WITH THE SP |
| 2025-04-15 | Department of Transportation | $120,800 | WEST BEND, WI – REPLACEMENT OF TILT OVER POLE AT BJB VOR SITE IN WEST BEND, WI I |
| 2024-06-27 | Department of Transportation | $109,067 | LAS VEGAS, NM – REPLACEMENT OF TILT-OVER POLE IN LAS VEGAS, NM IN ACCORDANCE WIT |
| 2023-03-06 | Department of Transportation | $103,947 | TO REPLACE ELECTRICAL POWER PANELS AT 3 LLWAS STTIONS AT DFW–STATIONS 2, 3, AND |