Total (All Time)$4M
Latest FY$1M
Primary AgencyDepartment of the Interior
HDR SCHNABEL RECLAMATION JOINT VENTURE has received $4M in total federal contract awards
across 3 fiscal year(s). ▲ 203.5% vs FY2023 Peak year was FY2022 ($2M).
Primary awarding agency: Department of the Interior.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2024 | $1.2M | 3건 | Department of the Interior | |
| FY2023 | $390,864 | 5건 | Department of the Interior | |
| FY2022 | $2.2M | 4건 | Department of the Interior |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2022-08-19 | Department of the Interior | $1.9M | COST ESTIMATING GUIDES FOR MR&R |
| 2024-01-18 | Department of the Interior | $775,143 | THE PURPOSE OF THIS TASK ORDER IS TO UPDATE THE AS-BUILT DRAWINGS FOR THE MTE PR |
| 2025-09-18 | Department of the Interior | $295,172 | TSC – 2025 PATILLAS DAM CRB |
| 2022-09-23 | Department of the Interior | $261,435 | HYRUM FINAL DESIGN AND CONSTRUCTION CRB |
| 2023-10-30 | Department of the Interior | $241,435 | ALTUS ET AL SEISMIC HAZARD ANALYSIS |
| 2025-08-29 | Department of the Interior | $214,521 | SEISMIC LOADINGS TECHNICAL PEER REVIEW BOARD-SUBJECT MATTER EXPERTS #2 AND #3 |
| 2023-02-09 | Department of the Interior | $200,064 | TSC – FOLSOM RIGHT WING DAM CRB |
| 2024-08-26 | Department of the Interior | $169,663 | TSS TSC-KACHESS CRB PHS#3-29997 |
| 2022-11-21 | Department of the Interior | $67,855 | OCHOCO TECHNICAL REVIEW |
| 2021-11-02 | Department of the Interior | $55,598 | PUEBLO DAM SEISMIC HAZARD STUDY |
| 2023-03-16 | Department of the Interior | $50,072 | TSC BULL LAKE SPLLWY CONSTR. CIVIL CRB |
| 2022-09-26 | Department of the Interior | $47,593 | MECH ENG DESIGN & CONST SUPPORT SERVICES |
| 2023-09-12 | Department of the Interior | $42,329 | TSC SCOGGINS DAM LOAD CRB 27609 |
| 2022-11-28 | Department of the Interior | $30,543 | TSC KACHESS DAM CRB PHASE 2 |