HUANG-CFM JOINT VENTURE Federal Contracts — Government Award History
Total (All Time)$13M
Latest FY$2M
Primary AgencySmithsonian Institution
HUANG-CFM JOINT VENTURE has received $13M in total federal contract awards
across 4 fiscal year(s). ▼ 58.8% vs FY2023 Peak year was FY2020 ($5M).
Primary awarding agency: Smithsonian Institution.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2024 | $1.6M | 5건 | Smithsonian Institution | |
| FY2023 | $3.8M | 10건 | Smithsonian Institution | |
| FY2021 | $3.0M | 22건 | Smithsonian Institution | |
| FY2020 | $4.9M | 12건 | Smithsonian Institution |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2023-10-25 | Smithsonian Institution | $1.1M | JOC#23517 OVERHAUL ACORN SEWAGE VACUUM SYSTEM @ NMNH. |
| 2023-05-15 | Smithsonian Institution | $961,747 | REPLACE ZONE TEMPERATURE CONTROL SYSTEMS AND AHUS AT GREAT CATS; F18CC10112; JOB |
| 2020-08-20 | Smithsonian Institution | $776,455 | SERVICE: REPLACE FAILING BAS SYSTEM AND BOILER FLUE CONTROLS. |
| 2020-08-06 | Smithsonian Institution | $748,158 | SERVICE: 20706 REPLACE COOLING TOWER FILL MEDIA, BEARINGS, MOTOR, AND SAND SIDE |
| 2020-07-02 | Smithsonian Institution | $735,265 | NPM CLEAN STEAM GENERATOR. |
| 2020-08-21 | Smithsonian Institution | $714,645 | OFMR PROJECT 209501: TOUCHLESS SENSOR-ACTIVATED FIXTURES PROJECT (VARIOUS ZONES) |
| 2023-07-26 | Smithsonian Institution | $700,931 | REPAIR COOLING TOWER |
| 2023-09-07 | Smithsonian Institution | $641,891 | JOC#23113 – REPLACE PAINT SHOP AIR HANDLING UNIT AHU 5, AHU 10, AND CONDENSATE P |
| 2020-06-26 | Smithsonian Institution | $579,156 | SERVICE: INSTALL NEW STEAM STATIONS AT NMAH PROJECT #20708. |
| 2020-07-06 | Smithsonian Institution | $496,118 | SERVICE, PLANNED MAINT PROJECT: 20463, REPAIR AHU’S PID LOOP AND TUNE TO PREVENT |
| 2023-07-17 | Smithsonian Institution | $482,548 | JOB #23483 – REPLACE KITCHEN HOT WATER TANKS 1, 2, 3 AND VALVES AT NMAI. |
| 2021-04-08 | Smithsonian Institution | $478,173 | REPLACE AHU 1,2 & 5 AT VET HOSPITAL; JOB ORDER #21605; CONTRACT: F18CC10112. |
| 2021-06-07 | Smithsonian Institution | $353,202 | PRO# 21323: REPLACE 2 HVAC UNIT BLDG 19 AND 28. |
| 2020-09-09 | Smithsonian Institution | $352,462 | PROJECT 20909: REPLACEMENT OF MULTIPLE FIRE PUMPS CONTROLLERS VARIOUS LOCATION. |
| 2021-05-13 | Smithsonian Institution | $296,677 | OFRM #21315: POD 3 & 5 STEAM STATION REPAIRS. |
| 2023-08-10 | Smithsonian Institution | $270,676 | JOC 23482 REPLACE STEAM HUMIDITY CONDENSATE PIPING AT NMAI-DC |
| 2020-07-13 | Smithsonian Institution | $244,682 | REPLACE FIRE PUMPS&CONTROLLERS PRJ# 20511, CONTRACT# F18CC10112. |
| 2021-05-12 | Smithsonian Institution | $242,754 | REPAIR/REPLACE EXHAUST TO SYSTEM FOR BOILERS DUE TO RUSTING & FAILING. |
| 2024-02-08 | Smithsonian Institution | $238,618 | SERVICE: JOC#23530, REPLACE CONDENSATE TANKS, PUMPS AND MOTOR ASSEMBLIES BUILDIN |
| 2023-09-07 | Smithsonian Institution | $229,352 | 23705 REPLACE ALL BATHROOM EXHAUST FANS PENTHOUSE/ROOF-REQUEST. |