IRPI LLC Federal Contracts — Government Award History
Total (All Time)$4M
Latest FY$1M
Primary AgencyNational Aeronautics and Space Administration
IRPI LLC has received $4M in total federal contract awards
across 4 fiscal year(s). ▼ 15.9% vs FY2024 Peak year was FY2024 ($1M).
Primary awarding agency: National Aeronautics and Space Administration.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $1.1M | 5건 | National Aeronautics and Space Administration | |
| FY2024 | $1.4M | 6건 | National Aeronautics and Space Administration | |
| FY2023 | $477,708 | 4건 | National Aeronautics and Space Administration | |
| FY2022 | $510,459 | 5건 | National Aeronautics and Space Administration |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2024-06-14 | National Aeronautics and Space Administration | $849,932 | SBIR PHASE 2 – FLUIDIC SOLUTIONS FOR IN SITU SAMPLE PREPARATION IN MICROGRAVITY |
| 2025-07-21 | National Aeronautics and Space Administration | $849,850 | PHASE II SBIR – GRAVITY INDEPENDENT CONDENSING HEAT EXCHANGER |
| 2020-06-12 | National Aeronautics and Space Administration | $749,375 | ADVANCED FLUIDS PROCESSING USING SUPERHYDROPHOBIC SURFACES |
| 2019-12-18 | National Aeronautics and Space Administration | $239,082 | IRPI PHASE 3 FOR CAPISORB |
| 2024-08-07 | National Aeronautics and Space Administration | $149,989 | FY24 SBIR PHASE I- GRAVITY INDEPENDENT CONDENSING HEAT EXCHANGER |
| 2022-07-25 | National Aeronautics and Space Administration | $149,976 | E014042 SBIR PHASE I MULTIPURPOSE OMNI-GRAVITATIONAL WET VACUUM FOR SPACE |
| 2025-09-29 | National Aeronautics and Space Administration | $149,965 | SBIR I LIGHTWEIGHT AND REGENERABLE COCC AND HCCO SEQUESTRATION SYSTEM |
| 2022-04-13 | National Aeronautics and Space Administration | $149,955 | EO14042 STIR PHASE III PLANT WATER MANAGEMENT DEMONSTRATION EXPERIMENT |
| 2023-02-16 | National Aeronautics and Space Administration | $149,935 | FY23 SBIR PHASE III – PLANT WATER MANAGEMENT DEMONSTRATION EXPERIMENT |
| 2023-08-03 | National Aeronautics and Space Administration | $149,929 | SBIR PHASE I – FLUIDIC SOLUTIONS FOR IN SITU SAMPLE PREPARATION IN MICROGRAVITY |
| 2023-11-28 | National Aeronautics and Space Administration | $149,903 | PLANT WATER MANAGEMENT DEMONSTRATION EXPERIMENT |
| 2024-07-09 | National Aeronautics and Space Administration | $98,664 | FY24 SBIR PHASE III – ADVANCED FLUIDS PROCESSING USING SUPERHYDROPHOBIC SURFACES |
| 2022-09-01 | National Aeronautics and Space Administration | $97,576 | E014042 SBIR PHASE III UNDERSTANDING THE FLUID BEHAVIOR OF FREE WATER INSIDE THE |
| 2023-07-18 | National Aeronautics and Space Administration | $90,949 | P3 – ISS EMU MICROGRAVITY FLUIDICS INVESTIGATIONS/ASSESSMENTS |
| 2023-05-15 | National Aeronautics and Space Administration | $86,895 | FY23 SBIR PHASE III DESIGN, DEVELOPMENT, AND TESTING OF A LIQUID DROPLET PARTICL |
| 2025-04-14 | National Aeronautics and Space Administration | $84,839 | PHASE III – INERTIAL SEPARATORS FOR FIRE SAFETY AND LUNAR DUST CLEANUP APPLICATI |
| 2022-04-19 | National Aeronautics and Space Administration | $71,953 | EO14042 SBIR PHASE III CAPTURE OF FINE PARTICULATES USING MULTIPLEXED INERTIAL S |
| 2024-08-23 | National Aeronautics and Space Administration | $69,932 | SBIR PHASE III LIQUID-GAS/BUBBLE SEPARATION DEVICES FOR FLEXIBLE BAGS IN |
| 2025-02-25 | National Aeronautics and Space Administration | $49,947 | FY25 PHASE III – PASSIVE URINE SEPARATOR FOR A CONTINGENCY TOILET |
| 2024-08-28 | National Aeronautics and Space Administration | $45,938 | SBIR PHASE III – DESIGN, PROTOTYPE MANUFACTURE, AND TESTING OF A LIQUID DROPLET |