M4 ENGINEERING, INC. Federal Contracts — Government Award History
Total (All Time)$13M
Latest FY$5M
Primary AgencyDepartment of Defense
M4 ENGINEERING, INC. has received $13M in total federal contract awards
across 5 fiscal year(s). ▲ 67.4% vs FY2024 Peak year was FY2025 ($5M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $4.9M | 4건 | Department of Defense | |
| FY2024 | $2.9M | 4건 | Department of Defense | |
| FY2023 | $1.4M | 4건 | Department of Defense | |
| FY2022 | $2.8M | 5건 | Department of Defense | |
| FY2021 | $1.2M | 4건 | National Aeronautics and Space Administration |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2025-09-29 | Department of Defense | $3.8M | A AS LANDING GEAR ENGINEERING SERVICES ANALYSIS |
| 2014-09-12 | Department of Defense | $1.5M | IGF::OT::IGF EVALUATION OF UNSTEADY LOADING ON STORE TRAJECTORIES SBIR II |
| 2024-03-07 | Department of Defense | $1.5M | STTR PHASE II R&D |
| 2022-05-06 | Department of Defense | $1.2M | PHYSICS-BASED STRUCTURAL ANALYSIS MODEL DEVELOPMENT AND INTEGRATION WITH COMPUTA |
| 2020-09-25 | National Aeronautics and Space Administration | $1.1M | GENERATIVE ADVERSARIAL NETWORKS FOR REAL-TIME REALISTIC PHYSICS SIMULATIONS |
| 2019-12-20 | National Aeronautics and Space Administration | $1.1M | NOVEL ASE SCALED MODEL DESIGN, FABRICATION, AND TESTING |
| 2022-08-22 | Department of Defense | $1.1M | BASIC RESEARCH & DEVELOPMENT DHA PHASE II SBIR 21.1 PROJECT TITLED, UNDERWATER B |
| 2023-08-08 | Department of Defense | $999,973 | RESEARCH AND DEVELOPMENT |
| 2019-05-02 | Department of Defense | $999,883 | IGF::OT::IGF RESEARCH AND DEVELOPMENT |
| 2024-01-29 | National Aeronautics and Space Administration | $849,994 | STTR PHASE II TOPOLOGY OPTIMIZATION FOR DESIGN OF HIGHLY TAILORED COMPOSITES FOR |
| 2025-07-10 | National Aeronautics and Space Administration | $849,987 | PHASE II SBIR 80NSSC25C0005 UAM DESIGN SPACE EXPLORATION FRAMEWORK WITH EMBEDDE |
| 2021-07-08 | National Aeronautics and Space Administration | $749,935 | OT AEROELASTICITY AND AEROSERVOELASTIC CONTROL |
| 2019-09-18 | National Aeronautics and Space Administration | $501,738 | PHYSICS-BASED CONCEPTUAL DESIGN TOOLS |
| 2023-10-01 | National Aeronautics and Space Administration | $449,990 | NASA MODEL-BASED SYSTEMS ANALYSIS AND ENGINEERING (MBSA&E) FOR THE SUSTAINABLE F |
| 2021-07-26 | Department of Defense | $249,972 | MEDICAL RESEARCH AND DEVELOPMENT DHA SBIR PH I H211-003-0280 |
| 2022-06-29 | Department of Defense | $239,977 | SBIR PHASE I |
| 2023-08-03 | National Aeronautics and Space Administration | $149,995 | SBIR PHASE I – UNSTEADY METRIC-BASED ADAPTATION VIA KOOPMAN EXPANSION OF THE FEA |
| 2022-11-23 | Department of Defense | $149,991 | SBIR/STTR PHASE I RESEARCH & DEVELOPMENT |
| 2025-09-29 | National Aeronautics and Space Administration | $149,991 | SBIR I PYFOIL81: ROTORCRAFT DESIGN TOOL AIRFOIL TABLE GENERATOR |
| 2024-08-07 | National Aeronautics and Space Administration | $149,989 | FY24 SBIR PHASE I- UAM DESIGN SPACE EXPLORATION FRAMEWORK WITH EMBEDDED VERSION |