MASTEN SPACE SYSTEMS INC Federal Contracts — Government Award History
Total (All Time)$96M
Latest FY$13M
Primary AgencyNational Aeronautics and Space Administration
MASTEN SPACE SYSTEMS INC has received $96M in total federal contract awards
across 2 fiscal year(s). ▼ 84.3% vs FY2020 Peak year was FY2020 ($83M).
Primary awarding agency: National Aeronautics and Space Administration.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2021 | $13.0M | 4건 | National Aeronautics and Space Administration | |
| FY2020 | $82.9M | 4건 | National Aeronautics and Space Administration |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2020-04-08 | National Aeronautics and Space Administration | $81.3M | TO ACQUIRE END-TO-END COMMERCIAL PAYLOAD SERVICES BETWEEN THE EARTH AND THE LUNA |
| 2021-04-20 | National Aeronautics and Space Administration | $10.0M | FLIGHT DEMONSTRATION OF A REUSABLE SUBORBITAL VEHICLE FOR TERRESTIAL TESTING OF |
| 2021-03-31 | National Aeronautics and Space Administration | $2.9M | METAL OXIDATION WARMING SYSTEM FUEL CELL DEVELOPMENT AND TESTING |
| 2017-09-15 | National Aeronautics and Space Administration | $1.3M | IGF::OT::IGFTHIS REQUIREMENT IS TO EXPAND THE FUNCTIONALITY AND CAPABILITIES OF |
| 2020-07-10 | National Aeronautics and Space Administration | $749,999 | TESTING DEEP CRATERING PHYSICS TO INFORM PLUME EFFECTS MODELING |
| 2020-07-10 | National Aeronautics and Space Administration | $749,998 | SURVIVING THE LUNAR NIGHT USING METAL OXIDATION WARMING SYSTEMS |
| 2019-08-09 | National Aeronautics and Space Administration | $749,593 | PERMIAM: ENGINEERED POROSITY IN-SITU WITH FULLY DENSE AM STRUCTURE |
| 2022-07-25 | National Aeronautics and Space Administration | $149,814 | EO14042 SBIR PHASE I ROTATING DETONATION ENGINE NOVEL INJECTOR DESIGN |
| 2020-06-18 | National Aeronautics and Space Administration | $148,776 | HOT GAS THRUSTER SUPPORT FOR MATERIALS RESEARCH OF.PLUME SURFACE INTERACTION EFF |
| 2022-07-25 | National Aeronautics and Space Administration | $148,691 | E014042 PHASE 1 SBIR |
| 2021-05-19 | National Aeronautics and Space Administration | $124,909 | EMBEDDED FIBER-OPTIC SENSING FOR SOLAR AND ELECTRIC SAILS |
| 2020-12-03 | National Aeronautics and Space Administration | $15,000 | PURCHASE OF LUNAR REGOLITH AND/OR ROCK MATERIALS FROM CONTRACTOR |