MEJIA INTERNATIONAL GROUP CORP Federal Contracts — Government Award History
Total (All Time)$6M
Latest FY$2M
Primary AgencyDepartment of Transportation
MEJIA INTERNATIONAL GROUP CORP has received $6M in total federal contract awards
across 4 fiscal year(s). ▲ 34.8% vs FY2024 Peak year was FY2025 ($2M).
Primary awarding agency: Department of Transportation.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $2.1M | 4건 | Department of Transportation | |
| FY2024 | $1.6M | 5건 | Department of Transportation | |
| FY2022 | $1.6M | 4건 | Department of Transportation | |
| FY2021 | $657,408 | 4건 | Department of Transportation |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2026-04-14 | Department of Transportation | $1.5M | COCKBURN TOWN, GT – TOWER REPLACEMENT |
| 2024-12-06 | Department of Transportation | $1.2M | MIAMI, FL – REPLACEMENT OF 3 ANTENNA TOWERS IN MIAMI, FL IN ACCORDANCE WITH THE |
| 2022-05-19 | Department of Transportation | $739,074 | DEMOLISH (4) FOUR 40 FT. HIGH PRE-EXISTING TOWERS AND PROVIDE AND INSTALL (4) FO |
| 2024-09-25 | Department of Transportation | $657,200 | REPLACE RCAG TOWERS AT VLD RCAG IN VALDOSTA, GA, IN ACCORDANCE WITH THE SOW, SPE |
| 2025-08-08 | Department of Transportation | $645,000 | JEKYLL ISLAND, GA – DESIGN AND CONSTRUCTION FOR REFURBISHING THE EXISTING VOR FA |
| 2019-11-08 | Department of Transportation | $572,970 | COMBINED REQUIREMENTS FOR REPLACEMENT OF COMMUNICATION TOWERS AT BRUNSWICK, GA A |
| 2022-02-23 | Department of Transportation | $507,000 | DEMOLISH (4) FOUR 40 FT. HIGH PRE-EXISTING TOWERS AND PROVIDE AND INSTALL (4) FO |
| 2024-09-13 | Department of Transportation | $432,000 | BQN ARSR GRATING AND GUARDRAIL REPLACEMENT |
| 2021-09-22 | Department of Transportation | $327,050 | NQX CABLE TROUGH AND ROOF REPLACEMENT |
| 2022-04-11 | Department of Transportation | $310,720 | REPAIR OF DAYTONA BEACH, FL LLWAS STATIONS #1, 2, 3, 7, 8 & 9. |
| 2024-09-10 | Department of Transportation | $307,785 | DCA FOR QP-2 PAINT ON TOWER IN ARLINGTON, VA |
| 2018-09-21 | Department of Transportation | $232,775 | HVAC REPLACEMENT PROJECT AT THE BORINQUEN (BQN) AIR ROUTE SURVEILLANCE RADAR (AR |
| 2021-09-27 | Department of Transportation | $164,001 | HURRICANE MARIA REPAIRS AT SIG ATCT (SAN JUAN, PUERTO RICO) |
| 2024-06-14 | Department of Transportation | $150,000 | REMOVE SOLAR PANEL WALL AND RECONSTRUCT CMU WALL AT THE CHATANOOGA METROPOLITAN |
| 2025-06-17 | Department of Transportation | $141,718 | REPLACE BOILER #1 FEEDER LINE AT ATL AIR TRAFFIC CONTROL TOWER IN ATLANTA, GA |
| 2023-05-25 | Department of Transportation | $139,465 | REPLACEMENT OF THE OLD LIGHTING WITH LEDS, ALL CLOTH WIRING/CONDUIT/SWITCHES IN |
| 2021-08-04 | Department of Transportation | $98,115 | CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, AND SUPERVISION ZMA BASEMENT WATER I |
| 2025-03-26 | Department of Transportation | $96,000 | SERVICE/ATL TOWB/FY25 EMERGENCY OPS – REPAIR SPALLING/CRACKING CONCRETE AT ATL A |
| 2022-05-18 | Department of Transportation | $92,700 | THIS PERFORMANCE-BASED ACQUISITION TASK ORDER SETS FORTH THE REQUIREMENTS FOR RE |
| 2019-09-09 | Department of Transportation | $74,554 | CONTRACTOR SHALL FURNISH LABOR, MATERIALS, AND EQUIPMENT TO REPLACE ALL EXISTING |