MN-BMCD SE JV Federal Contracts — Government Award History
Total (All Time)$21M
Latest FY$10M
Primary AgencyDepartment of Defense
MN-BMCD SE JV has received $21M in total federal contract awards
across 4 fiscal year(s). ▲ 225.3% vs FY2024 Peak year was FY2025 ($10M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $9.7M | 9건 | Department of Defense | |
| FY2024 | $3.0M | 3건 | Department of Defense | |
| FY2023 | $3.3M | 10건 | Department of Defense | |
| FY2021 | $5.2M | 5건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2024-12-18 | Department of Defense | $5.1M | EHW2 UTILITIES AND EHW1 UTILITIES DESIGN, NAVAL STATION KINGS BAY, GA |
| 2025-03-11 | Department of Defense | $2.8M | TASK ORDER TO REPAIR AND UPGRADE PIER |
| 2024-09-24 | Department of Defense | $2.2M | FLOATING DRY DOCK SITE EVALUATION STUDY |
| 2021-09-17 | Department of Defense | $1.7M | 21E-FULL DESIGN OF P617 TRANSIT PROTECTION PROGRAM FACILITY |
| 2021-02-25 | Department of Defense | $1.2M | 21E-FULL DESIGN FOR KINGS BAY – MSF REPAIRS – PIER (BLDG 5980) AN |
| 2021-01-13 | Department of Defense | $979,965 | 21E-P021 LIGHTERAGE WHARF AND LIFT-LAUNCH PIER PDA |
| 2023-09-14 | Department of Defense | $766,669 | 23E-REPAIRS TO TRF INTERFACE WHARF |
| 2021-06-11 | Department of Defense | $699,892 | 21E – TRP REFIT STRUCTURAL ANALYSIS AND CATHODIC PROTECTION SYSTE |
| 2021-09-10 | Department of Defense | $622,085 | NS MAYPORT – DLA PIER 1455 REPAIRS – AE DESIGN |
| 2024-08-15 | Department of Defense | $604,740 | 24E-RECAPITALIZE WHARF BRAVO AND DETACHMENT FACILITIES |
| 2025-08-05 | Department of Defense | $590,675 | THE CONTRACTORS PROPOSAL DATED 17 JUNE 2025 IS HEREBY INCORPORATED AND MADE A PA |
| 2023-05-15 | Department of Defense | $397,732 | 23E-SUBASE KINGS BAY – DRY DOCK CATHODIC PROTECTION REPAIR – DESI |
| 2025-08-05 | Department of Defense | $378,212 | STRUCTURAL ANALYSIS OF SITE VI NORTH TRESTLE |
| 2023-08-11 | Department of Defense | $371,571 | 23E-BIC – WATERFRONT REPAIRS – AE DESIGN |
| 2023-08-21 | Department of Defense | $361,755 | 23E-REPLACE T-PIER FENDERS |
| 2023-03-23 | Department of Defense | $318,511 | 23E-NAS JAX HURRICANE IAN REPAIR AND RESTORATION, SHORELINE EROSI |
| 2023-03-06 | Department of Defense | $297,186 | 23E-HURRICANE IAN SUPPORT AND RECOVERY |
| 2023-08-17 | Department of Defense | $237,573 | SOUTH BOCA CHICA SHORELINE RESTORATION STUDY (ENGINEERING WITH NATURE), KEY WEST |
| 2023-02-23 | Department of Defense | $230,265 | 23E-SE FY23 HURRICANE IAN SUPPORT |
| 2023-08-24 | Department of Defense | $209,303 | 23E-SUBASE KINGS BAY, CAMEL TUG ANALYSIS AND MODIFICATIONS – AE D |