P2S LP Federal Contracts — Government Award History
Total (All Time)$26M
Latest FY$2M
Primary AgencyDepartment of Defense
P2S LP has received $26M in total federal contract awards
across 5 fiscal year(s). ▼ 65.7% vs FY2020 Peak year was FY2017 ($7M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2021 | $1.9M | 4건 | Department of Defense | |
| FY2020 | $5.5M | 10건 | Department of Defense | |
| FY2019 | $5.6M | 9건 | Department of Defense | |
| FY2018 | $6.4M | 10건 | Department of Defense | |
| FY2017 | $6.8M | 4건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2017-09-22 | Department of Defense | $5.7M | IGF::OT::IGF X032 P907 AE DESIGN SERVICES FOR FY MCON P907, TPS P |
| 2018-12-21 | Department of Defense | $3.6M | IGF::OT::IGF X052 P447 – AE DESIGN CONTRACT FOR DRYDOCK 4 AND PIER 3 MODERNIZATI |
| 2018-04-02 | Department of Defense | $2.7M | IGF::OT::IGF SPECIAL PROJECT RM16-1558 REPAIR SHIPYARD ELECTRICAL BACKBONE SUBST |
| 2020-09-24 | Department of Defense | $1.4M | PSNS&IMF FIRE PROTECTION SURVEY |
| 2018-09-25 | Department of Defense | $1.4M | DESIGN REPAIR CIF VENTILATION SYSTEM, B/983 PSNS BREMERTON, WA |
| 2020-08-13 | Department of Defense | $1.4M | ELECTRICAL DISTRIBUTION SYSTEM STUDY, MANCHESTER FUE |
| 2019-06-28 | Department of Defense | $774,341 | BD9Z34 (BBTH7) UEM-DESIGN MODERNIZATION OF ELECTRICAL SUBSTATION FIVE |
| 2020-09-25 | Department of Defense | $756,212 | INSTALL ENVIRONMENTAL CONTROLS HVAC PW2, 4, 5, AND 6 |
| 2017-09-22 | Department of Defense | $685,756 | IGF::OT::IGF P401 POST CONSTRUCTION AWARD SERVICES (PCAS) |
| 2021-08-31 | Department of Defense | $594,025 | 18646593 AE-DBB UPGRADE FUELS LAB B194 |
| 2021-08-13 | Department of Defense | $593,252 | SPECIAL PROJECT RM20-0165 (PHASE 3 & 4) SEISMIC RESILIENCY S. EXTENSION, UPPER F |
| 2018-02-13 | Department of Defense | $489,054 | IGF::OT::IGF X038 AE STUDY ELECTRICAL DISTRIBUTION SYSTEM, NAS |
| 2020-08-21 | Department of Defense | $471,060 | REPLACE EXPANSION JOINT TO REMOVE F24 |
| 2018-06-04 | Department of Defense | $445,016 | IGF::OT::IGF X045 FIRE PROTECTION-FIRE REPORTING SYSTEMS, B384, N |
| 2020-09-18 | Department of Defense | $440,469 | (BDV6XY) (M3B) (CIP) RELOCATE SHOP FLOOR PROCESS, B514 / 489, NUWC KEYPORT |
| 2019-01-30 | Department of Defense | $431,475 | UEM DESIGN MODERNIZE 15 KV SWITCHGEAR DELTA PIER |
| 2017-11-09 | Department of Defense | $428,593 | IGF::CT::IGF X036 P891 FEC DD1391 VALIDATION |
| 2021-06-10 | Department of Defense | $398,421 | REPLACE ACCESS DOORS AT B1 & B12, MFD |
| 2018-09-27 | Department of Defense | $364,824 | DESIGN IMPROVEMENT OF INDUSTRIAL PROCESS VENTILATION B/514 NUWC KEYPORT, WA |
| 2020-09-24 | Department of Defense | $338,295 | 18483922, (16611083 AE STUDY)(M3A) DRY DOCK ELEVATOR FEASIBILITY |