PARACLETE MAINTENANCE & DESIGN, LLC Federal Contracts — Government Award History
Total (All Time)$895,126
Latest FY$266,119
Primary AgencyDepartment of Agriculture
PARACLETE MAINTENANCE & DESIGN, LLC has received $895,126 in total federal contract awards
across 4 fiscal year(s). ▼ 29.6% vs FY2023 Peak year was FY2023 ($377,897).
Primary awarding agency: Department of Agriculture.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2024 | $266,119 | 4건 | Department of Agriculture | |
| FY2023 | $377,897 | 4건 | Department of Agriculture | |
| FY2022 | $187,019 | 5건 | Department of Agriculture | |
| FY2021 | $64,091 | 3건 | Department of Agriculture |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2023-09-15 | Department of Agriculture | $257,376 | 1486-1 CALCASIEU RANGER DISTRICT, ENDURO CAMGROUND REPAIRS |
| 2024-09-16 | Department of Agriculture | $112,000 | RENOVATE ENGINEER BUILDING AT SO, MAKE REPAIRS TO FLOOR, CEILING AND PLUMBING TO |
| 2025-03-15 | Department of Agriculture | $94,604 | EXCAVATE AND REPLACE REINFORCED 36″ CONCRETE CULVERT ON NFSR 145. |
| 2023-07-28 | Department of Agriculture | $84,677 | WINN RD – REMOVE OLD SEEDLING COOLER AND INSTALL NEW SEEDLING COOLER IN EXISTING |
| 2024-09-13 | Department of Defense | $84,466 | PURCHASE, DELIVERY AND INSTALLATION OF ENTRANCE GATES IN ACCORDANCE WITH ATTACHM |
| 2024-09-17 | Department of Agriculture | $55,482 | REPAIR ASPHALT SHINGLE ROOF ON THE TRANSPORTATION STORAGE BUILDING AND REPLACE S |
| 2022-09-27 | Department of Agriculture | $51,575 | KISATCHIE DISTRICT OFFICE PERIMETER FENCE REPAIR, FENCE REMOVAL AND REPLACEMENT |
| 2022-05-26 | Department of Agriculture | $45,000 | UPGRADE KNF FIRE SHOP KITCHEN, RESTROOMS, ENTRANCE, AND HALLWAY. THE CONTRACTS P |
| 2026-01-12 | Department of Agriculture | $39,825 | SRS PINEVILLE ROOF REPAIR: THIS PROJECT IS TO REPAIR ROOF DAMAGE AT THE SRS’S FS |
| 2022-07-18 | Department of Agriculture | $37,996 | STUART SEED ORCHARD FENCE REPAIR |
| 2020-08-05 | Department of Agriculture | $30,184 | HOMER WORK CENTER REHABILITATION |
| 2022-07-17 | Department of Agriculture | $28,493 | INSTALL METAL ROOFING AND TWO STEEL-PANELED RAISED GARAGE DOORS WITH KEYED LOCKS |
| 2021-07-06 | Department of Agriculture | $26,596 | REPLACE 3 GARAGE DOORS AND INSTALL NEW METAL ROOF ON SEED ORCHARD BUILDING, CATA |
| 2023-07-10 | Department of Agriculture | $24,785 | FRAME UP WALL IN HALLWAY AND INSTALL SOUNDPROOF DOOR. REMODEL MOP CLOSET TO FIT |
| 2020-09-21 | Department of Agriculture | $24,773 | AFC STORE FRONT REHABILITATION |
| 2022-09-20 | Department of Agriculture | $23,955 | CASS WAREHOUSE EXTERIOR DOOR REPLACEMENT |
| 2021-06-11 | Department of Agriculture | $22,115 | HOMER WORK CENTER GATE REPLACEMENT ON THE KISATCHIE NATIONAL FOREST, CANEY RANGE |
| 2021-05-17 | Department of Agriculture | $15,380 | REMOVE SEEDLING COOLER AND PREPARE SLAB IN ACCORDANCE WITH THE ATTACHED SPECIFIC |
| 2024-04-05 | Department of Agriculture | $14,171 | TASK ORDER FOR CANEY WORK CENTER ROOF REPAIR. |
| 2023-02-10 | Department of Agriculture | $11,059 | KIS-CON-CONF ROOM FLOORING, WATER FOUNTAIN, AND CONSTRUCT AWNING |