PETTIBONE CONCRETE CONSTRUCTION INC Federal Contracts — Government Award History
Total (All Time)$29M
Latest FY$957,510
Primary AgencyDepartment of Defense
PETTIBONE CONCRETE CONSTRUCTION INC has received $29M in total federal contract awards
across 5 fiscal year(s). ▼ 46.9% vs FY2024 Peak year was FY2022 ($16M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $957,510 | 3건 | Department of Defense | |
| FY2024 | $1.8M | 4건 | Department of Defense | |
| FY2023 | $4.8M | 3건 | Department of Defense | |
| FY2022 | $16.0M | 8건 | Department of Defense | |
| FY2020 | $5.5M | 4건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2021-11-09 | Department of Defense | $4.8M | THE PURPOSE OF THIS TASK IS ORDER IS TO REPAIR TAXIWAY H. |
| 2022-09-27 | Department of Defense | $4.0M | THE PURPOSE OF THIS PROJECT IS TO REPAIR THE AIRFIELD PAVEMENT LOCATED ON TAXIWA |
| 2022-07-15 | Department of Defense | $2.6M | REPAIR AIRFIELD PAVEMENTS (TAXIWAY F CENTER KEEL SLABS) |
| 2020-07-28 | Department of Defense | $2.4M | REPAIR TRIM PAD AND POWER CHECK APRON AT TYNDALL AFB |
| 2020-04-07 | Department of Defense | $2.3M | WORK CONSISTS OF JOINT SEALANT REMOVAL AND REPLACEMENT, TO INCLUDE JOINT WIDENIN |
| 2022-09-14 | Department of Defense | $1.9M | WORK CONSISTS OF REPAIRS TO EXISTING CENTERLINE ROAD LOCATED BETWEEN RUNWAY 14R/ |
| 2023-06-12 | Department of Defense | $1.7M | REPAIR EXISTING STORM WATER DRAINPIPE AND DRAINAGE STRUCTURES. |
| 2023-09-14 | Department of Defense | $1.7M | REPAIR EXISTING STORMWATER INFRASTRUCTURE (DRAINPIPE AND INLET STRUCTURES) AT SE |
| 2023-01-05 | Department of Defense | $1.4M | CONVERT PAVEMENT AND EXPAND TAXIWAY BRAVO |
| 2022-09-14 | Department of Defense | $1.0M | THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR AIRFIELD PAVEMENT ON THE OPERATIONS |
| 2024-01-05 | Department of Defense | $872,229 | MAINTAIN AIRFIELD PAINT MARKINGS ON THE TYNDALL FLIGHTLINE AND REMOVE EXCESS RUB |
| 2025-08-25 | Department of Defense | $834,492 | AIRFIELD MARKING REPAIRS AND PAINTING |
| 2022-05-19 | Department of Defense | $825,905 | THE PURPOSE OF THIS TASK ORDER IS TO ADD ADDITIONAL PAINT MARKINGS. |
| 2021-09-29 | Department of Defense | $788,776 | THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR AIRFIELD PAVEMENT ON THE OPERATIONS |
| 2024-07-03 | Department of Defense | $771,379 | REPAIR EXISTING BARRIER FOUNDATIONS ON DRONE RUNWAY |
| 2022-09-27 | Department of Defense | $767,333 | THE PROJECT IS FOR AIRFIELD MARKING REPAIRS AND PAINTING ON TYNDALL AFB MAIN AIR |
| 2020-09-16 | Department of Defense | $383,770 | WORK CONSISTS OF SLURRY SEAL TREATMENT ON OUTSIDE RUNWAY ASPHALT AND RANDOM SLAB |
| 2020-07-28 | Department of Defense | $376,295 | DEMOLITION AND REPLACEMENT OF EXISTING PORTLAND CEMENT CONCRETE (PCC) SLABS WITH |
| 2021-09-24 | Department of Defense | $233,629 | THE PURPOSE OF THIS REQUIREMENT IS TO SERVICE AIRFIELD OPERATIONS IN TOWING AWAY |
| 2024-04-15 | Department of Defense | $98,434 | THE GOVERNMENT REQUESTS A PROPOSAL TO REPAIR EXISTING TAXIWAY K CONCRETE SURFACE |