QUADRUS CORPORATION Federal Contracts — Government Award History
Total (All Time)$13M
Latest FY$3M
Primary AgencyDepartment of Defense
QUADRUS CORPORATION has received $13M in total federal contract awards
across 6 fiscal year(s). ▲ 721.2% vs FY2024 Peak year was FY2020 ($6M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $3.3M | 4건 | Department of Defense | |
| FY2024 | $400,000 | 3건 | National Aeronautics and Space Administration | |
| FY2023 | $1.9M | 4건 | Department of Defense | |
| FY2022 | $739,980 | 3건 | Department of Defense | |
| FY2021 | $899,922 | 3건 | National Aeronautics and Space Administration | |
| FY2020 | $6.2M | 7건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2020-04-30 | Department of Defense | $2.9M | RESEARCH AND DEVELOPMENT LOW-LATENCY, HIGH-AMPLITUDE TVC |
| 2026-03-02 | Department of Defense | $2.0M | SBIR PHASE II |
| 2025-08-27 | Department of Defense | $2.0M | SBIR DIRECT TO PHASE II: ADDITIVE MANUFACTURING THAT ENABLES A LOW COST DACS ARC |
| 2020-04-01 | Department of Defense | $1.6M | SBIR/STTR PHASE II R&D: ADDITIVELY MANUFACTURED REFRACTORY METAL NOZZLE COMPONEN |
| 2023-02-02 | Department of Defense | $1.5M | SBIR/STTR PHASE II R&D – SLM OF GEOMETRY BASED THERMAL CONTROL SOLUTIONS |
| 2019-08-19 | Department of Defense | $999,973 | SBIR 18.2 PHASE II – ASRC FEDERAL R&D FOR AN ADDITIVELY MANUFACTURED LIGHTWEIGHT |
| 2018-07-20 | National Aeronautics and Space Administration | $990,999 | ARCTIC SLOPE TECHNICAL SERVICES, INC. (ASTS) IS PLEASED TO PROPOSE TO CONTINUE T |
| 2025-07-03 | National Aeronautics and Space Administration | $849,951 | PHASE II SBIR 80NSSC25C0085 VALIDATING A NOVEL RDRE NOZZLE OPTIMIZATION APPROACH |
| 2020-09-30 | National Aeronautics and Space Administration | $839,981 | HIGHLY COMPATIBLE ADDITIVELY MANUFACTURED LOX INJECTORS |
| 2021-08-10 | National Aeronautics and Space Administration | $749,937 | AN ADDITIVELY MANUFACTURED, LEAK-PROOF NTO SWIVEL |
| 2020-04-02 | National Aeronautics and Space Administration | $557,176 | ADDITIVELY MANUFACTURED BIMETALLIC COMBUSTION CHAMBERS FOR SMALL LAUNCH VEHICLES |
| 2022-06-07 | Department of Defense | $499,990 | DEFENSE ADVANCED RESEARCH PROJECTS AGENCY (DARPA) SMALL BUSINESS INNOVATION RESE |
| 2025-09-30 | National Aeronautics and Space Administration | $320,099 | PHASE III – FROZEN RETURN OF SAMPLES TO EARTH (FROSTE) CONTAINMENT/SEALING SYSTE |
| 2023-08-03 | National Aeronautics and Space Administration | $150,000 | SBIR PHASE I – AN AFFORDABLE, HYBRID-ELECTRIC PROPULSION ARCHITECTURE FOR SMALL |
| 2024-08-07 | National Aeronautics and Space Administration | $150,000 | FY24 SBIR PHASE I- NEXT-GENERATION ENABLING, EXTREME TEMPERATURE RDRE |
| 2024-08-07 | National Aeronautics and Space Administration | $150,000 | FY24 SBIR PHASE I- OPTIMIZED AND LIGHTWEIGHT ROTATING DETONATION ROCKET ENGINE |
| 2023-08-03 | National Aeronautics and Space Administration | $149,999 | SBIR PHASE I – IMPROVING ION ENGINE OPTICS THROUGH ADDITIVE MANUFACTURING |
| 2022-11-21 | Department of Defense | $149,998 | SBIR/STTR PHASE I RESEARCH & DEVELOPMENT HIGH-RESOLUTION MODELING OF PLUME EXHAU |
| 2025-09-29 | National Aeronautics and Space Administration | $149,995 | SBIR PHASE 1 – ADDITIVELY MANUFACTURED SCALMALLOYAE EMU SPACESUIT BEARINGS |
| 2021-12-03 | Department of Defense | $149,993 | SBIR/STTR PHASE I RESEARCH & DEVELOPMENT – SELECTIVE LASER MELTING OF LATTICE ST |