RIO VISTA MANAGEMENT LLC Federal Contracts — Government Award History
Total (All Time)$58M
Latest FY$827,222
Primary AgencyDepartment of Defense
RIO VISTA MANAGEMENT LLC has received $58M in total federal contract awards
across 6 fiscal year(s). ▼ 70.8% vs FY2025 Peak year was FY2022 ($20M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2026 | $827,222 | 4건 | Department of Defense | |
| FY2025 | $2.8M | 9건 | Department of Defense | |
| FY2024 | $9.3M | 6건 | Department of Defense | |
| FY2022 | $19.9M | 10건 | Department of Defense | |
| FY2021 | $16.5M | 26건 | Department of Defense | |
| FY2020 | $9.1M | 10건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2021-11-24 | Department of Defense | $9.5M | BLDG. 5 BAY E |
| 2024-07-16 | Department of Defense | $5.5M | BUILDING 19 RENOVATIONS AT TOBYHANNA ARMY DEPOT, TOBYHANNA PA 18466 |
| 2020-06-22 | Department of Defense | $5.0M | UPGRADE EXISTING STEAM SYSTEM FOR BUILDING 220 |
| 2022-03-29 | Department of Defense | $4.8M | BLDG 220 INFO ON THE SOW |
| 2024-07-05 | Department of Defense | $3.1M | SATCOM TEST RANGE RENOVATION |
| 2018-09-26 | Department of Defense | $2.5M | B 225 REPAIR ENTRYWAY |
| 2021-09-20 | Department of Defense | $2.2M | BUILDING 14 REPAIR SWITCHGEAR |
| 2021-07-27 | Department of Defense | $2.0M | REPAIR FIRE SYSTEM AND HVAC SYSTEM |
| 2022-04-26 | Department of Defense | $2.0M | BLDG 100 BAY K REPLACE CEILING |
| 2021-06-24 | Department of Defense | $1.8M | BLDG 100 BAY D REPLACE FIRE SUPPRESSION/DETECTION |
| 2021-09-11 | Department of Defense | $1.7M | BLDG. 225 – RENOVATE KITCHEN AREA |
| 2020-07-29 | Department of Defense | $1.7M | REPLACE FIRE SUPPRESSION SYSTEM/ALARM SYSTEM |
| 2021-02-26 | Department of Defense | $1.6M | BUILDING 238 REPLACE WAC COOLING, AIR COMPRESSORS, AND RECEIVING TANKS |
| 2021-08-19 | Department of Defense | $1.1M | BLDG 737 EXPAND LGP PLANT CONSTRUCT ENERGY MANAGEMENT CONTROL CENTER |
| 2021-08-04 | Department of Defense | $1.1M | REPLACE LAD EQUIPMENT |
| 2022-05-09 | Department of Defense | $1.1M | BLDG 60060 40060 CONSTRUCT AWNING |
| 2022-03-10 | Department of Defense | $942,013 | REPLACE COMPRESSORS AND COOLING, B202. |
| 2025-06-20 | Department of Defense | $782,715 | CONSTRUCTION: EPOXY FLOORING IN BUILDINGS 3 AND 7, INCLUDING THE DISMANTLING AN |
| 2021-07-27 | Department of Defense | $662,159 | BLDG 729 RELOCATED RADAR WITH UTILITIES |
| 2025-01-02 | Department of Defense | $661,195 | THIS TASK ORDER IS TO INSTALL PIPE SUPPORTS IN BUILDING 1A AT THE TOBYHANNA ARMY |