RIVER DESIGN GROUP, INC. Federal Contracts — Government Award History
Total (All Time)$1M
Latest FY$195,688
Primary AgencyDepartment of Agriculture
RIVER DESIGN GROUP, INC. has received $1M in total federal contract awards
across 3 fiscal year(s). ▼ 62.3% vs FY2022 Peak year was FY2022 ($518,785).
Primary awarding agency: Department of Agriculture.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2023 | $195,688 | 4건 | Department of Agriculture | |
| FY2022 | $518,785 | 9건 | Department of Agriculture | |
| FY2021 | $322,189 | 7건 | Department of Agriculture |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2022-09-16 | Department of Agriculture | $126,735 | GAOA – DESIGN FOR REPLACEMENT OF CRAZY WOMAN BRIDGE BIGHORN NATIONAL FOREST 1. |
| 2021-03-30 | Department of Agriculture | $109,998 | PERFORM BRIDGE INSPECTIONS. |
| 2022-09-22 | Department of Agriculture | $101,580 | PERFORM SITE SURVEYS, GEOTECHNICAL INVESTIGATION AS WELL AS PREPARE PRELIMINARY |
| 2022-05-18 | Department of Agriculture | $85,243 | NZ TRAIL 222 PACK RIVER SUSPENSION BRIDGE S&D NZ FSR 419 LIGHTNING CREEK HARDENE |
| 2021-09-30 | Department of Agriculture | $76,540 | NEW CONTRACT ACTION. PROVIDE ENGINEERING SUPPORT SERVICES AS REQUESTED. PLEASE |
| 2022-09-30 | Department of Agriculture | $64,190 | GAOA.IDIQ TASK ORDER FOR TALLY LAKE CAMPGROUND WATER SYSTEM DESIGN (RIVER DESIGN |
| 2023-09-07 | Department of Agriculture | $60,460 | PRIMARY DUTIES INCLUDE FIELD INSPECTION, SURVEYING, LOAD RATING, OR ENGINEERING |
| 2023-09-15 | Department of Agriculture | $57,013 | ARCHITECT AND ENGINEERING DESIGN TASK ORDER TO CONTRACT #12034320D0039 |
| 2023-05-16 | Department of Agriculture | $55,991 | PROFESSIONAL ENG TECHNICAL SERVICES – RIVER DESIGN GROUP – REGION 1 – “ON-CALL” |
| 2021-07-28 | Department of Agriculture | $42,493 | KOOTENAI NATIONAL FOREST BRIDGE INSPECTIONS |
| 2021-07-17 | Department of Agriculture | $42,331 | THIS PROJECT INCLUDES PREPARATION OF THE FINAL PS&E PACKAGE FOR RIVER ACCESS SIT |
| 2022-09-02 | Department of Agriculture | $42,040 | GAOA MT BITTERROOT ROMBO CAMPGROUND SHORELINE STABILIZATION (1DM) |
| 2018-08-01 | Department of the Interior | $33,658 | IGF::OT::IGF TITLE: CONSTRUCTION OVERSIGHT FOR STREAM RESTORATION PROJECT ON JIM |
| 2021-10-19 | Department of Agriculture | $33,463 | GAOA BITTERROOT CIVIL A&E MISSION SUPPORT SERVICES |
| 2022-09-28 | Department of Agriculture | $27,459 | SEEPAGE TESTING OF THE POWELL SEWER LAGOON, NEZ PERCE NATIONAL FOREST |
| 2023-03-30 | Department of Agriculture | $22,224 | A&E DESIGN OF ARSENIC REMOVAL SYSTEM TO BE INSTALLED. |
| 2021-06-17 | Department of Agriculture | $20,993 | CLEAR CREEK MAINSTEM REHABILITATION AND BRIDGE CROSSING SURVEY AND PRIMARY REHAB |
| 2022-05-11 | Department of Agriculture | $20,295 | THE OBJECTIVE OF THE PROJECT IS TO REPLACE THE EXISTING CMP WITH A STRUCTURE THA |
| 2021-06-01 | Department of Agriculture | $18,116 | LRFD BRIDGE FOUNDATION INVESTIGATION TASK ORDER UNDER THE REGION 1 SCWWID DESIGN |
| 2022-09-29 | Department of Agriculture | $17,780 | GAOA SEELEY REC CAMPGROUNDS & DAY USE SITES MAINT & REPAIRS (1BS) – ELECTRICAL U |