ROCK GAP ENGINEERING LLC Federal Contracts — Government Award History

Total (All Time)$40M
Latest FY$7M
Primary AgencyDepartment of the Interior

ROCK GAP ENGINEERING LLC has received $40M in total federal contract awards
across 5 fiscal year(s). ▼ 30.4% vs FY2024 Peak year was FY2022 ($11M).
Primary awarding agency: Department of the Interior.

Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).

Awards by Fiscal Year

Year Spending Total Contracts Top Agency
FY2025

$6.8M 7건 Department of the Interior
FY2024

$9.7M 9건 Department of the Interior
FY2023

$10.8M 14건 Department of the Interior
FY2022

$11.5M 13건 Department of the Interior
FY2021

$992,896 4건 Department of the Interior

Notable Contracts

Date Agency Amount Description
2024-08-26 Department of the Interior $4.5M CON: BLDG 108 GYMNASIUM RENOVATION
2022-09-16 Department of the Interior $3.2M CHEMAWA MATOC PROJECT
2025-08-26 Department of the Interior $2.4M IE048-URGENT-HVAC DESIGN/BUILD BLDG85-86
2025-09-23 Department of the Interior $2.1M TUBA CITY OU 2 & 3 – EXCAVATION & BIO-REMEDIATION, BIA, NRO, BEM
2024-08-29 Department of the Interior $1.9M CON – OUTSIDE BASKETBALL COURTS & PAVILION
2023-09-18 Department of the Interior $1.8M RESIDENTIAL FLOOR TILE
2024-05-07 Department of the Interior $1.5M NEW PLAYGROUND FOR SFPES K-8TH
2023-09-21 Department of the Interior $1.4M INSTALLATION OF RUNNING TRACK FOR RIS
2022-09-08 Department of the Interior $1.3M OUTDOOR SHADED STRUCTURE
2023-09-18 Department of the Interior $1.2M INSTALL WALKWAYS AND ROAD WAY
2023-09-20 Department of the Interior $1.2M ROOF REPAIR AND REPLACEMENT TO BLDG 77
2025-09-23 Department of the Interior $896,433 REPLACEMENT OF TWO WATER STORAGE TANKS IN NAVAJO PARTITIONED LANDS.
2022-09-22 Department of the Interior $889,844 PLAYGROUND EQUIPMENT TDS
2022-08-10 Department of the Interior $888,148 BLACKWATER PORTABLES RELOCATION
2022-09-23 Department of the Interior $883,765 WATER TANKS FOR BIA, NAVAJO REGION, NPL
2022-09-23 Department of the Interior $848,950 CAMERON WATERLINE PROJECT, BIA, NAVAJO REGION, WESTERN NAVAJO AGENCY
2023-09-21 Department of the Interior $789,000 METAL WALKWAYS
2023-09-19 Department of the Interior $764,358 CAFETERIA FLOOR REPLACEMENT
2022-09-15 Department of the Interior $756,199 PLAYGROUND EQUIPMENT SRDS
2023-08-26 Department of the Interior $753,500 REPLACE DOOR AND WINDOWS – MARIANO LAKE