SENTINEL POWER SERVICES, LLC Federal Contracts — Government Award History
Total (All Time)$52M
Latest FY$114,877
Primary AgencyDepartment of Transportation
SENTINEL POWER SERVICES, LLC has received $52M in total federal contract awards
across 9 fiscal year(s). ▼ 90.0% vs FY2025 Peak year was FY2022 ($18M).
Primary awarding agency: Department of Transportation.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2026 | $114,877 | 3건 | Department of Transportation | |
| FY2025 | $1.2M | 5건 | Department of Transportation | |
| FY2024 | $11.9M | 54건 | Department of Transportation | |
| FY2023 | $7.4M | 42건 | Department of Transportation | |
| FY2022 | $17.5M | 45건 | Department of Transportation | |
| FY2021 | $1.1M | 10건 | Department of Transportation | |
| FY2020 | $6.0M | 9건 | Department of Transportation | |
| FY2019 | $1.0M | 4건 | Department of Transportation | |
| FY2018 | $6.2M | 20건 | Department of Transportation |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2016-12-19 | Department of Defense | $13.6M | IGF::OT::IGF SITE SURVEY FOR LAX ATCT CPDS |
| 2022-02-22 | Department of Transportation | $8.3M | CONDUCT SITE-SPECIFIC FST SYSTEM UPGRADE AND REPLACEMENT AT FOUR CO-LOCATED FACI |
| 2020-09-15 | Department of Transportation | $2.6M | FABRICATE TEMP SYSTEM SWITCHGEAR TRAILERS FOR TS3,TS4, AND TS5 TO SUPPORT ACEPS |
| 2016-06-27 | Department of Transportation | $2.6M | CONDUCT FST SYSTEM MODERNIZATION ACTIVITIES IN ACCORDANCE WITH CONTRACTOR BASELI |
| 2020-09-15 | Department of Transportation | $2.5M | CONDUCT SITE SURVEYS AND DEVELOP SITE SPECIFIC DESIGNS FOR FY21 FST INSTALLATION |
| 2022-08-25 | Department of Transportation | $577,706 | F11 FUNDED ECONOMIC ADJUSTMENT TO MODERNIZE CRITICAL POWER SYSTEM FOR CPDS LAX A |
| 2018-07-31 | Department of Transportation | $540,543 | CONDUCT SITE SURVEYS AND FST INSTALLATION AT VARIOUS LOCATIONS |
| 2023-11-27 | Department of Transportation | $538,828 | PICO DEL ESTE (QJQ) AND AGUADILLA (BQN), PR ARSR LPGBS CONSTRUCTION |
| 2023-01-25 | Department of Transportation | $527,229 | BIL: CONDUCT INSTALLATION OF DIESEL FST PER ATTACHED SOW, APPROVED DESIGN DRAWIN |
| 2022-08-01 | Department of Transportation | $518,461 | BIL UPS CONSTRUCTION COST |
| 2024-08-16 | Department of Transportation | $514,158 | BIL FUNDS. SITE SURVEY, DESIGN, INSTALL FOR EG/ERMS FST POWER SYSTEM REPLACEMENT |
| 2024-08-21 | Department of Transportation | $513,856 | 2024 OUTDOOR & INDOOR EG BASELINE FUNDING FOR SITES SURVEY, DESIGN AND INSTALL T |
| 2023-01-25 | Department of Transportation | $491,643 | BIL: CONDUCT INSTALLATION AND CHANGE ORDER OF DIESEL FST PER ATTACHED SOW, APPRO |
| 2018-07-16 | Department of Transportation | $477,506 | CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND |
| 2024-08-12 | Department of Transportation | $429,940 | BIL: ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF OUTDOOR EG WITH |
| 2024-08-01 | Department of Transportation | $410,037 | 2024 OUTDOOR EG BASELINE FUNDING FOR SITES SURVEY, DESIGN AND INSTALL TO REPLACE |
| 2024-08-01 | Department of Transportation | $410,037 | 2024 OUTDOOR BASELINE FUNDING FOR SITES SURVEY, DESIGN AND INSTALL TO REPLACE PO |
| 2018-07-16 | Department of Transportation | $408,546 | CONDUCT SITE SURVEYS FOR FST INSTALLATIONS AT VARIOUS LOCATIONS PER CONTRACT AND |
| 2018-07-31 | Department of Transportation | $408,289 | CONDUCT SITE SURVEYS AND FST INSTALLATION AT VARIOUS LOCATIONS |
| 2023-07-13 | Department of Transportation | $408,009 | ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT GRAND T |