SEOJIN CONSTRUCTION CO.,LTD Federal Contracts — Government Award History

Total (All Time)$9M
Latest FY$2M
Primary AgencyDepartment of Defense

SEOJIN CONSTRUCTION CO.,LTD has received $9M in total federal contract awards
across 2 fiscal year(s). ▼ 80.6% vs FY2024 Peak year was FY2024 ($8M).
Primary awarding agency: Department of Defense.

Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).

Awards by Fiscal Year

Year Spending Total Contracts Top Agency
FY2025

$1.5M 11건 Department of Defense
FY2024

$7.8M 31건 Department of Defense

Notable Contracts

Date Agency Amount Description
2024-07-02 Department of Defense $926,915 MAXIMUM CONTRACT AMOUNT – K WORK
2024-07-05 Department of Defense $687,610 MAXIMUM CONTRACT AMOUNT – K WORK
2024-07-01 Department of Defense $618,887 REPAIR DETERIORATED BLDG. NO. S-1330, BSF
2025-09-08 Department of Defense $598,421 REPAIR FAILED OR FAILING STORM DRAINAGE SYSTEM, CAMP CARROLL
2024-04-18 Department of Defense $545,734 MAXIMUM CONTRACT AMOUNT – K WORK REPAIR HVAC SYSTEM CASEY, RLFC
2024-05-01 Department of Defense $538,131 RPR ROOF & EXTERIOR WALL B139, C/C
2024-07-02 Department of Defense $523,243 REPAIR THE DETERIORATED BLDG 1715, CH
2024-07-23 Department of Defense $450,598 REPLACE FIRE HYDRANTS AT CP TANGO
2024-07-16 Department of Defense $430,388 REPAIR DAMAGED PARKING LOT NEAR BLDG P-12301, USAG-HUMPHREY
2024-07-01 Department of Defense $427,974 REPAIR DFAC,BLDG 303 AT CAMP CARROLL
2024-07-01 Department of Defense $309,976 MAXIMUM CONTRACT AMOUNT – K WORK
2024-07-09 Department of Defense $297,714 REPLACE WATER PIPE AT B502, CAMP CARROLL
2024-07-10 Department of Defense $293,131 MAXIMUM CONTRACT AMOUNT – K WORK
2024-07-14 Department of Defense $287,066 REPAIR PARKING LOTS NEAR BLDG P-111
2024-06-14 Department of Defense $215,922 REPAIR BLDG. #1910 & BLDG. #1911 AT AMMO DEPOT #2
2024-06-17 Department of Defense $176,003 REPLACE SURFACE DRAINAGE SYSTEM AT OBSTACLE COURSE S-8230, USAG HUMPHREYS
2025-08-25 Department of Defense $175,005 FLOORING AND PAINTING REPLACEMENT AT BLDG 2650, PIER 8
2025-08-05 Department of Defense $167,401 INSTALL BACKUP BOILER FOR BLDG 830, CAMP WALKER
2025-03-26 Department of Defense $159,236 REFINISH POOL DECK, RECAULK POOL AREA AND REPLACE LIGHT FIXTURES BLDG 265 AT CAM
2024-07-09 Department of Defense $145,620 REPAIR B127, CAMP CARROLL