STV-MOFFATT NICHOL DHS JOINT VENTURE Federal Contracts — Government Award History
Total (All Time)$4M
Latest FY$1M
Primary AgencyDepartment of Homeland Security
STV-MOFFATT NICHOL DHS JOINT VENTURE has received $4M in total federal contract awards
across 2 fiscal year(s). ▼ 50.2% vs FY2018 Peak year was FY2018 ($2M).
Primary awarding agency: Department of Homeland Security.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2020 | $1.2M | 3건 | Department of Homeland Security | |
| FY2018 | $2.5M | 3건 | Department of Homeland Security |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2018-09-27 | Department of Homeland Security | $1.4M | A&E TO ASSESS THE FEASIBILITY OF RENOVATION OF AN EXISTING DORMITORY BUILDING IN |
| 2020-03-31 | Department of Homeland Security | $864,181 | P/N 13306294; A-E DESIGN SERVICES FOR 18HSB_BUILDING AND SITE REPAIRS AT CG SECT |
| 2018-05-29 | Department of Homeland Security | $619,466 | IRMA A/E DESIGN SVCS M&R AT CG SECTOR ST. PETERSBURG NORTH&SOUTH MOORINGS (PINEL |
| 2025-05-14 | Department of Homeland Security | $503,239 | THE CG REQUIRES THE SERVICES OF A LICENSED PROFESSIONAL ELECTRICAL ENGINEER TO S |
| 2018-09-27 | Department of Homeland Security | $407,639 | A&E FOR DESIGN SERVICES – ARTESIA BORDER PATROL 100 YARD AND 300 YARD TACTICAL A |
| 2021-04-12 | Department of Homeland Security | $299,694 | ACQUIRE A-E DESIGN SERVICES FOR A DESIGN TO MITIGATE FLOODING OF LEASE DORMITORY |
| 2020-02-21 | Department of Homeland Security | $293,840 | AA-E DESIGN SERVICES FOR WATERFRONT REPAIRS AT CG SECTOR FIELD OFFICE FORT MACON |
| 2022-09-08 | Department of Homeland Security | $266,910 | ARCHITECTURAL/ENGINEERING SERVICES FOR REPAIR HVAC SYSTEMS AT U.S. COAST GUARD A |
| 2023-04-26 | Department of Homeland Security | $215,804 | A/E DESIGN OF EVALUATE AND OPTIMIZE WASTEWATER PRETREATMENT SYSTEM IN BLDG 77 AT |
| 2024-07-10 | Department of Homeland Security | $148,479 | DESIGN OF FLOOD MITIGATION FOR BUILDINGS 185, 186, AND 187- GLYNCO, GA |
| 2023-08-03 | Department of Homeland Security | $117,813 | A/ E REPAIR SANITARY SYSTEM BLDG 54 AT USCG BASE ELIZABETH CITY ELIZABETH CITY, |
| 2025-01-27 | Department of Homeland Security | $105,694 | DESIGN REPAIR WATERFRONT UTILITIES AT USCG BASE SAN JUAN, PR. |
| 2020-09-14 | Department of Homeland Security | $70,699 | AE DESIGN SERVICES FOR A FEASIBILITY STUDY FOR FLOOD MITIGATION AT THE LEASE DOR |
| 2022-08-01 | Department of Homeland Security | $63,515 | A/E WASTEWATER TREATMENT PLANT CONDITION ASSESSMENT AT USCG SFO CHINCOTEAGUE, V |