TRC ENVIRONMENTAL CORP Federal Contracts — Government Award History
Total (All Time)$18M
Latest FY$434,406
Primary AgencyDepartment of Transportation
TRC ENVIRONMENTAL CORP has received $18M in total federal contract awards
across 9 fiscal year(s). ▼ 84.3% vs FY2025 Peak year was FY2020 ($4M).
Primary awarding agency: Department of Transportation.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2026 | $434,406 | 3건 | Department of Transportation | |
| FY2025 | $2.8M | 17건 | Department of Transportation | |
| FY2024 | $1.9M | 13건 | Department of Transportation | |
| FY2023 | $2.2M | 17건 | Department of Transportation | |
| FY2022 | $2.9M | 13건 | Department of Transportation | |
| FY2021 | $1.5M | 13건 | Department of Transportation | |
| FY2020 | $3.6M | 18건 | Department of Transportation | |
| FY2019 | $1.3M | 8건 | Department of Transportation | |
| FY2018 | $873,460 | 8건 | Department of Transportation |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2015-11-23 | General Services Administration | $1.2M | IGF::OT::IGF ACCEPTANCE TESTING OF FILTERS |
| 2020-08-19 | Department of Transportation | $767,004 | THIS PURPOSE OF ISSUING THIS TASK ORDER IS TO COMPLETE A(CERCLA) SUPPLEMENTAL SI |
| 2022-05-11 | Department of Transportation | $765,549 | AREA B PERMEABLE ADSORPTIVE BARRIER – CONDUCT A PRE-DESIGN STUDY, PERMITTING, AN |
| 2023-09-01 | Department of Transportation | $576,801 | TRC TO 102 BIL JCN 22004904 ERSS CLIN 1 COMPLETE A PREDESIGN STUDY, ADMINISTR |
| 2020-08-20 | Department of Transportation | $522,458 | THE PURPOSE OF ISSUING THIS TASK ORDER IS FOR THE BUILDING 301 HANGAR DRAIN LINE |
| 2024-12-20 | Department of Transportation | $493,569 | NEW TRC TO 115 AREA 41 TANK NTCRA |
| 2025-04-14 | Department of Transportation | $451,081 | NEW TRC TO 121 AREA Y NTCRA REGULATORY |
| 2023-09-07 | Department of Transportation | $417,659 | NEW TRC TASK ORDER 97 CONDUCT A FEASIBILITY STUDY FOR SUPERFUND AREA Y BUILDINGS |
| 2018-08-23 | Department of Transportation | $416,267 | FFP. AOC 41 SITE EVALUATION |
| 2024-03-13 | Department of Transportation | $406,683 | CONDUCT THE YEAR 2 POST PLUMESTOP INJECTION PLANNING, PREPARATION, AND GROUNDWAT |
| 2022-09-01 | Department of Transportation | $399,468 | CONDUCT THE POST PLUMESTOP INJECTION PLANNING, PREPARATION, AND GROUNDWATER SAMP |
| 2022-07-14 | Department of Transportation | $383,247 | PRE-DESIGN STUDY, COMPLETE ADMINISTRATIVE ACTIONS, AND PREPARE A REMEDIAL DESIGN |
| 2020-08-27 | Department of Transportation | $355,411 | THE PURPOSE OF ISSUING THIS TASK ORDER IS TO COMPLETE FATE AND TRANSPORT MODELIN |
| 2014-05-29 | Department of Transportation | $302,872 | SUPERFUND HYDROGEOLOGY AND ENGINEERING STUDIES TAS::69 8107::TAS IGF::OT::IGF I |
| 2022-08-11 | Department of Agriculture | $289,872 | ARCHAEOLOGICAL ASSESSMENT FOR SITE DAMAGE AND CUMULATIVE CONTEXTS: NRHP ARCHEOL |
| 2025-02-05 | Department of Transportation | $287,318 | PERFORM YEAR 2 POST-PERMEABLE ADSORPTIVE BARRIER (PAB) INJECTION GROUNDWATER SAM |
| 2024-01-03 | Department of Transportation | $280,762 | NEW TRC TO 104 AREA B PAB BASELINE SAMPLING |
| 2021-05-20 | Department of Transportation | $271,218 | THE PURPOSE OF THIS TASK ORDER TO CONDUCT SUPPLEMENTAL SITE EVALUATION AVGAS FUE |
| 2020-05-22 | Department of Transportation | $255,626 | THE PURPOSE FOR ISSUING THIS TASK ORDER IS TO COMPLETE A SUPPLEMENTAL REMEDIAL I |
| 2026-01-22 | Department of Transportation | $242,990 | NEW NON-TIME-CRITICAL REMOVAL ACTION (NTCRA) FOR SUPERFUND AREA 56 AT THE WILLIA |