ULTRAMET Federal Contracts — Government Award History
Total (All Time)$25M
Latest FY$6M
Primary AgencyDepartment of Defense
ULTRAMET has received $25M in total federal contract awards
across 6 fiscal year(s). ▲ 117.7% vs FY2024 Peak year was FY2023 ($7M).
Primary awarding agency: Department of Defense.
Data covers largest contracts by award amount. Source: USASpending.gov (FPDS).
Awards by Fiscal Year
| Year | Spending | Total | Contracts | Top Agency |
|---|---|---|---|---|
| FY2025 | $5.7M | 8건 | Department of Defense | |
| FY2024 | $2.6M | 5건 | Department of Defense | |
| FY2023 | $6.9M | 6건 | Department of Defense | |
| FY2022 | $4.3M | 12건 | Department of Defense | |
| FY2021 | $481,453 | 4건 | Department of Defense | |
| FY2017 | $5.5M | 5건 | Department of Defense |
Notable Contracts
| Date | Agency | Amount | Description |
|---|---|---|---|
| 2023-08-14 | Department of Defense | $3.9M | SP4701-23-C-0049 SBIR PHASE II REQUIREMENT. |
| 2017-09-19 | Department of Defense | $3.3M | IGF::OT::IGF ADVANCED CMCS FOR EXPENDABLE HYPERSONIC VEHICLES |
| 2024-11-18 | Department of Defense | $1.8M | SBIR PHASE III R&D DEVELOPMENT AND DEMONSTRATION OF CVD HIGH TEMPERATURE OXIDATI |
| 2019-11-15 | Department of Defense | $1.7M | MATERIALS ARCHITECTURES AND CHARACTERIZATION FOR HYPERSONICS (MACH) |
| 2022-03-30 | Department of Defense | $1.7M | SBIR/STTR PHASE II R&D:HYPERSONIC AIR PLATFORM CONTROL SURFACES |
| 2025-01-06 | Department of Defense | $1.5M | SBIR/STTR PHASE II R&D – SILICIDE COATINGS ON REFRACTORY METAL ALLOYS FOR HIGH T |
| 2016-10-20 | Department of Defense | $1.5M | ::IGF::OT::IGF SBIR PHASE II RESEARCH&DEVELOPMENT |
| 2024-01-11 | Department of Defense | $1.4M | SBIR/STTR PHASE II R&D PROPULSION SYSTEMS |
| 2023-02-14 | Department of Defense | $1.2M | CATALYTIC IGNITION SYSTEM FOR ASCENT-BASED PROPULSION SYSTEMS, PHASE II |
| 2025-02-10 | Department of Defense | $1.0M | STTR PHASE II PEPIN ASSOCIATES PROPOSAL L2S-0055 TITLED ULTRAMETS PROPOSAL INCR |
| 2018-06-12 | Department of Defense | $996,716 | SBIR/STTR PHASE II R&D LOW-DENSITY ABLATOR-FILLED FOAM INCORPORATING LYOCELL-DER |
| 2015-05-27 | National Aeronautics and Space Administration | $890,000 | IGF::OT::IGF IN THIS WORK, ULTRAMET IS DEVELOPING A THREE-DIMENSIONAL (3D) LASER |
| 2024-07-09 | National Aeronautics and Space Administration | $850,000 | SBIR PHASE II – HIGH-EMISSIVITY CVD DENDRITIC RHENIUM COATINGS FOR NEP RADIATOR |
| 2025-08-05 | National Aeronautics and Space Administration | $849,999 | PHASE II SBIR – HIGH-PERFORMANCE DEORBIT ENGINE WITH MINIMAL POWER REQUIREMENTS, |
| 2023-07-20 | National Aeronautics and Space Administration | $849,967 | EO14042 SBIR PHASE II MATERIALS FOR STRUCTURAL AND THERMAL PRESERVATION OF SAMPL |
| 2012-07-30 | Department of Defense | $849,889 | SBIR PHASE II – MODELING&EMPIRICIZING THE DECOMPOSITION OF HAN-BASED MONOPROPELL |
| 2019-05-25 | Department of Defense | $750,000 | IGF::OT::IGF SBIR PHASE II – AF-315 MONIOPROPELLANT CUBESATS PROPULSION SYSTEM |
| 2022-03-10 | Department of Defense | $750,000 | NON-CARCINOGENIC, REDUCED-TOXICITY FUEL/CATALYST REPLACEMENT FOR THE F-16 EMERGE |
| 2021-10-14 | Department of Defense | $750,000 | SBIR II: INCREASED-LIFETIME HIGH-CURRENT CATHODES USING MICROENGINEERED MATERIAL |
| 2018-05-11 | National Aeronautics and Space Administration | $749,715 | TO RETURN A SAMPLE FROM THE SURFACE OF MARS OR ANY OF THE LARGER MOONS IN THE SO |